Laserfiche WebLink
SECTION 01200 <br />PROJECT MEETINGS <br />PART 1— GENERAL <br />1.01 REQUIREMENTS INCLUDED <br />A. The Contractor shall cooperate and coordinate with theeR ResidentProject Represengs ntative <br />to schedule and administer pre -construction meeting , p progress meet <br />specially called meetings throughout progress of the work. <br />1. Prepare agenda for meetings. <br />2. Make physical arrangements for meetings. <br />3. Preside at meetings. <br />4, Record the minutes; include significant proceedings and decisions. <br />5. Reproduce and distribute copies of minutes within 15 working days after each <br />meeting. <br />a. To participants in the meeting. <br />b. To Owner, Engineer, and other parties affected by decisions made at the <br />meeting. <br />__onfat;vPs of Contractors, Owner, Subcontractors and suppliers attending meetings <br />