Laserfiche WebLink
2.04 <br />2.05 <br />TEMPORARY WATER CONTROL <br />A. The flow of water through the oehowever, it shall be divertedoantd ctor such <br />that it does not damage any constructed items; <br />channeled to effectively leave the site as soon as possible. Puddling and ponding on the <br />site is not permitted. <br />B. Water shall be controlled such that it does not enter excavated areas, nor is deposited on <br />or against constructed features. <br />TEMPORARY DEBRIS CONTROL <br />A. Provision shall be made by each aConilble t nerstshould be c veredcontainers to d <br />any and all debris that is to b generated from the project <br />to prevent wind blowing paper, plastic, and lightweight products around and off the site. <br />B. Instructions shall be given <br />tthe snn el to utilize the trash containers . Containers shall be <br />placed in convenient places <br />a <br />bris shall be <br />C. At least once per week, a thoroughethod of disptosal shall rash andbe employed. made at the <br />construction site. An acceptable <br />END OF SECTION <br />