My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-018B
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-018B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2018 2:10:04 PM
Creation date
3/23/2016 8:37:03 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
01/22/2018
Control Number
2013-018B
Agenda Item Number
8.H.
Entity Name
West Regional Wastewater Treatment Plant
Subject
Anaerobic Tanks Odor Control System Design
Project Number
UCP - 4067
Bid Number
2013013
Alternate Name
WWTP
Supplemental fields
FilePath
H:\Indian River\Network Files\SL000008\S0002K7.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
11749
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
506
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.04 <br />2.05 <br />TEMPORARY WATER CONTROL <br />A. The flow of water through the oehowever, it shall be divertedoantd ctor such <br />that it does not damage any constructed items; <br />channeled to effectively leave the site as soon as possible. Puddling and ponding on the <br />site is not permitted. <br />B. Water shall be controlled such that it does not enter excavated areas, nor is deposited on <br />or against constructed features. <br />TEMPORARY DEBRIS CONTROL <br />A. Provision shall be made by each aConilble t nerstshould be c veredcontainers to d <br />any and all debris that is to b generated from the project <br />to prevent wind blowing paper, plastic, and lightweight products around and off the site. <br />B. Instructions shall be given <br />tthe snn el to utilize the trash containers . Containers shall be <br />placed in convenient places <br />a <br />bris shall be <br />C. At least once per week, a thoroughethod of disptosal shall rash andbe employed. made at the <br />construction site. An acceptable <br />END OF SECTION <br />
The URL can be used to link to this page
Your browser does not support the video tag.