Laserfiche WebLink
B. The Contractor shall be responsible for changing the oil in all drives and intermediate <br />drives of each mechanical equipment after initial break-in of the equipment, which in no <br />event shall be any longer than three weeks of operation. <br />PART 2 — PRODUCTS (NOT USED) <br />PART 3 — EXECUTION (NOT USED) <br />END OF SECTION <br />