My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-018B
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-018B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2018 2:10:04 PM
Creation date
3/23/2016 8:37:03 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
01/22/2018
Control Number
2013-018B
Agenda Item Number
8.H.
Entity Name
West Regional Wastewater Treatment Plant
Subject
Anaerobic Tanks Odor Control System Design
Project Number
UCP - 4067
Bid Number
2013013
Alternate Name
WWTP
Supplemental fields
FilePath
H:\Indian River\Network Files\SL000008\S0002K7.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
11749
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
506
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.05 SUBSTITUTIONS <br />A. In order for substitutions to be considered, the Contractor shall submit, within 30 days of <br />issuance of Notice of Award, complete data as set forth herein to permit complete analysis <br />of all proposed substitutions noted on his substitutions list. No substitution shall be <br />considered unless the Contractor provides the required data in accordance with the <br />requirements of this Section within the 30 day period. <br />B. Submit separate request for each substitution. Support each request with: <br />1, Complete data substantiating compliance of proposed substitution with <br />requirements stated in Contract Documents: <br />a. Product identification, including manufacturer's name and address. <br />b. Manufacturer's literature; identify: <br />1) Product description. <br />2) Reference standards. <br />3) Performance and test data. <br />4) Operation and maintenance data. <br />C. Samples, as applicable. <br />d. Name and address of similar projects on which product has been used, <br />and date of each installation. <br />2. Itemized comparison of the proposed substitution with product specified; List <br />significant variations. Substitution shall not change design intent and shall <br />perform equal to that specified. <br />3. Data relating to impact on construction schedule occasioned by the proposed <br />
The URL can be used to link to this page
Your browser does not support the video tag.