Laserfiche WebLink
1.05 SUBSTITUTIONS <br />A. In order for substitutions to be considered, the Contractor shall submit, within 30 days of <br />issuance of Notice of Award, complete data as set forth herein to permit complete analysis <br />of all proposed substitutions noted on his substitutions list. No substitution shall be <br />considered unless the Contractor provides the required data in accordance with the <br />requirements of this Section within the 30 day period. <br />B. Submit separate request for each substitution. Support each request with: <br />1, Complete data substantiating compliance of proposed substitution with <br />requirements stated in Contract Documents: <br />a. Product identification, including manufacturer's name and address. <br />b. Manufacturer's literature; identify: <br />1) Product description. <br />2) Reference standards. <br />3) Performance and test data. <br />4) Operation and maintenance data. <br />C. Samples, as applicable. <br />d. Name and address of similar projects on which product has been used, <br />and date of each installation. <br />2. Itemized comparison of the proposed substitution with product specified; List <br />significant variations. Substitution shall not change design intent and shall <br />perform equal to that specified. <br />3. Data relating to impact on construction schedule occasioned by the proposed <br />