My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-018B
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-018B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2018 2:10:04 PM
Creation date
3/23/2016 8:37:03 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
01/22/2018
Control Number
2013-018B
Agenda Item Number
8.H.
Entity Name
West Regional Wastewater Treatment Plant
Subject
Anaerobic Tanks Odor Control System Design
Project Number
UCP - 4067
Bid Number
2013013
Alternate Name
WWTP
Supplemental fields
FilePath
H:\Indian River\Network Files\SL000008\S0002K7.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
11749
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
506
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
In order to induce OWNER to enter into this Agreement, CONTRACTOR makes the following <br />representations: <br />7.1 CONTRACTOR has familiarized itself with the nature and extent of the Contract Documents, <br />work, site, locality, and all local conditions and laws and regulations that in any manner may <br />affect cost, progress, performance or furnishing of the work. <br />7.2 CONTRACTOR has studied carefully all reports of explorations and tests of subsurface <br />conditions and drawings of physical conditions which are identified in the Supplementary <br />Conditions as provided in Paragraph 4.02 of the General Conditions, and accepts the <br />determination set forth in Paragraph SC -4.02 of the Supplementary Conditions of the extent <br />of the technical data contained in such reports and drawings upon which CONTRACTOR is <br />entitled to rely. <br />7.3 CONTRACTOR has obtained and carefully studied (or assumes responsibility for obtaining <br />and carefully studying) all such examinations, investigations, explorations, tests, reports and <br />studies (in addition to or to supplement those referred to in Paragraph 7.2 above) which <br />pertain to the subsurface or physical conditions at or contiguous to the site or otherwise may <br />affect the cost, progress, performance or furnishing of the work as CONTRACTOR considers <br />necessary for the performance of furnishing of the work at the Contract Price, within the <br />Contract Time and in accordance with the other terms and conditions of the Contract <br />Documents, including specifically the provisions of Paragraph 4.02 of the General Conditions; <br />and no additional examinations, investigations, explorations, tests, reports, studies or similar <br />information or data are or will be required by CONTRACTOR for such purposes. <br />7.4 CONTRACTOR has reviewed and checked all information and data shown or indicated on <br />the Contract Documents with respect to existing underground facilities at or contiguous to the <br />site and assumes responsibility for the accurate location of said underground facilities. No <br />additional examinations, investigations, explorations, tests, reports, studies or similar <br />information or data in respect of said underground facilities are or will be required by <br />CONTRACTOR in order to perform and furnish the work at the Contract Price, within the <br />Contract Time and in accordance with the other terms and conditions of the Contract <br />Documents, including specifically the provisions of Paragraph 4.04 of the General Conditions. <br />7.5 CONTRACTOR has correlated the results of all such observations, examinations, <br />investigations, explorations, tests, reports and studies with the terms and conditions of the <br />Contract Documents. <br />7.6 CONTRACTOR has given ENGINEER written notice of all conflicts, errors or discrepancies <br />that he has discovered in the Contract Documents and the written resolution thereof by <br />ENGINEER is acceptable to CONTRACTOR. <br />ARTICLE 8 CONTRACT DOCUMENTS. <br />The Contract Documents which comprise the entire agreement between OWNER and <br />CONTRACTOR concerning the work consist of the following: <br />8.1 This Agreement (Section 00530). <br />8.2 Public Construction Bond (Section 00610). <br />8.3 Notice of Award and Notice to Proceed (examples in Section 00800). <br />00530-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.