not involve a change in the Contract Price or the Contract
<br />Times.
<br />21. General Requirements --Sections of Division 1 of
<br />the Specifications. The General Requirements pertain to
<br />all sections of the Specifications.
<br />22. Hazardous Environmental Condition --The
<br />presence at the Site of Asbestos, PCBs, Petroleum,
<br />Hazardous Waste, or Radioactive Material in such
<br />quantities or circumstances that may present a substantial
<br />danger to persons or property exposed thereto in
<br />connection with the Work.
<br />23. Hazardous Waste --The term Hazardous Waste
<br />shall have the meaning provided in Section 1004 of the
<br />Solid Waste Disposal Act (42 USC Section 6903) as
<br />amended from time to time.
<br />24. Laws and Regulations; Laws or Regulations --
<br />Any and all applicable laws, rules, regulations, ordinanc-
<br />es, codes, and orders of any and all governmental bodies,
<br />agencies, authorities, and courts having jurisdiction.
<br />25. Liens --Charges, security interests, or
<br />encumbrances upon Project funds, real property, or
<br />personal property.
<br />26. Milestone --A principal event specified in the
<br />Contract Documents relating to an intermediate comple-
<br />tion date or time prior to Substantial Completion of all the
<br />Work.
<br />27. Notice of Award --The written notice by Owner
<br />to the Successful Bidder stating that upon timely
<br />compliance by the Successful Bidder with the conditions
<br />precedent listed therein, Owner will sign and deliver the
<br />Agreement.
<br />28. Notice to Proceed --A written notice given by
<br />Owner to Contractor fixing the date on which the Con-
<br />tract Times will commence to run and on which
<br />Contractor shall start to perform the Work under the
<br />Contract Documents.
<br />29. Owner --The individual or entity with whom
<br />Contractor has entered into the Agreement and for whom
<br />the Work is to be performed.
<br />30. PCBs --Polychlorinated biphenyls.
<br />31. Petroleum --Petroleum, including crude oil or any
<br />fraction thereof which is liquid at standard conditions of
<br />temperature and pressure (60 degrees Fahrenheit and 14.7
<br />pounds per square inch absolute), such as oil, petroleum,
<br />fuel oil, oil sludge, oil refuse, gasoline, kerosene, and oil
<br />mixed with other non -Hazardous Waste and crude oils.
<br />32. Progress Schedule --A schedule, prepared and
<br />maintained by Contractor, describing the sequence and
<br />duration of the activities comprising the Contractor's plan
<br />to accomplish the Work within the Contract Times.
<br />33. Project --The total construction of which the
<br />Work to be performed under the Contract Documents may
<br />be the whole, or a part.
<br />34. Project Manual --The bound documentary
<br />information prepared for bidding and constructing the
<br />Work. A listing of the contents of the Project Manual,
<br />which may be bound in one or more volumes, is
<br />contained in the table(s) of contents.
<br />35. Radioactive Material --Source, special nuclear, or
<br />byproduct material as defined by the Atomic Energy Act
<br />of 1954 (42 USC Section 2011 et seq.) as amended from
<br />time to time.
<br />36. Related Entity -- An officer, director, partner,
<br />employee, agent, consultant, or subcontractor.
<br />37. Resident Project Representative --The authorized
<br />representative of Engineer who may be assigned to the
<br />Site or any part thereof.
<br />38. Samples --Physical examples of materials,
<br />equipment, or workmanship that are representative of
<br />some portion of the Work and which establish the
<br />standards by which such portion of the Work will be
<br />judged.
<br />39. Schedule of Submittals --A schedule, prepared
<br />and maintained by Contractor, of required submittals and
<br />the time requirements to support scheduled performance
<br />of related construction activities.
<br />40. Schedule of Values --A schedule, prepared and
<br />maintained by Contractor, allocating portions of the
<br />Contract Price to various portions of the Work and used
<br />as the basis for reviewing Contractor's Applications for
<br />Payment.
<br />41. Shop Drawings --All drawings, diagrams,
<br />illustrations, schedules, and other data or information
<br />which are specifically prepared or assembled by or for
<br />Contractor and submitted by Contractor to illustrate some
<br />portion of the Work.
<br />42. Site --Lands or areas indicated in the Contract
<br />Documents as being furnished by Owner upon which the
<br />Work is to be performed, including rights-of-way and
<br />easements for access thereto, and such other lands
<br />furnished by Owner which are designated for the use of
<br />Contractor.
<br />EJCDC C-700 Standard General Conditions of the Construction Contract.
<br />Copyright C 2002 National Society of Professional Engineers for EJCDC. All rights reserved.
<br />00700-7
<br />
|