Laserfiche WebLink
settlement with the insurers in accordance with such <br />agreement as the parties in interest may reach. If no such <br />agreement among the parties in interest is reached, Owner <br />as fiduciary shall adjust and settle the loss with the <br />insurers and, if required in writing by any party in <br />interest, Owner as fiduciary shall give bond for the proper <br />performance of such duties. <br />5.09 Acceptance of Bonds and Insurance; Option to <br />Replace <br />A. If either Owner or Contractor has any objection to the <br />coverage afforded by or other provisions of the bonds or <br />insurance required to be purchased and maintained by the <br />other party in accordance with Article 5 on the basis of <br />non-conformance with the Contract Documents, the <br />objecting party shall so notify the other party in writing <br />within 10 days after receipt of the certificates (or other <br />evidence requested) required by Paragraph 2.01.13. Owner <br />and Contractor shall each provide to the other such <br />additional information in respect of insurance provided as <br />the other may reasonably request. If either party does not <br />purchase or maintain all of the bonds and insurance <br />required of such party by the Contract Documents, such <br />party shall notify the other party in writing of such failure <br />to purchase prior to the start of the Work, or of such <br />failure to maintain prior to any change in the required <br />coverage. Without prejudice to any other right or remedy, <br />the other party may elect to obtain equivalent bonds or <br />insurance to protect such other party's interests at the <br />expense of the party who was required to provide such <br />coverage, and a Change Order shall be issued to adjust the <br />Contract Price accordingly. <br />5.10 Partial Utilization, Acknowledgment of Property <br />Insurer <br />A. If Owner finds it necessary to occupy or use a portion <br />or portions of the Work prior to Substantial Completion <br />of all the Work as provided in Paragraph 14.05, no such <br />use or occupancy shall commence before the insurers <br />providing the property insurance pursuant to Paragraph <br />5.06 have acknowledged notice thereof and in writing <br />effected any changes in coverage necessitated thereby. <br />The insurers providing the property insurance shall <br />consent by endorsement on the policy or policies, but the <br />property insurance shall not be canceled or permitted to <br />lapse on account of any such partial use or occupancy. <br />ARTICLE 6 - CONTRACTOR'S RESPONSIBILITIES <br />6.01 Supervision and Superintendence <br />sequences, and procedures of construction. Contractor <br />shall not be responsible for the negligence of Owner or <br />Engineer in the design or specification of a specific <br />means, method, technique, sequence, or procedure of <br />construction which is shown or indicated in and expressly <br />required by the Contract Documents. <br />B. At all times during the progress of the Work, <br />Contractor shall assign a competent resident superin- <br />tendent who shall not be replaced without written notice <br />to Owner and Engineer except under extraordinary <br />circumstances. The superintendent will be Contractor's <br />representative at the Site and shall have authority to act on <br />behalf of Contractor. All communications given to or <br />received from the superintendent shall be binding on <br />Contractor. <br />6.02 Labor; Working Hours <br />A. Contractor shall provide competent, suitably qualified <br />personnel to survey and lay out the Work and perform <br />construction as required by the Contract Documents. <br />Contractor shall at all times maintain good discipline and <br />order at the Site. <br />B. Except as otherwise required for the safety or <br />protection of persons or the Work or property at the Site <br />or adjacent thereto, and except as otherwise stated in the <br />Contract Documents, all Work at the Site shall be <br />performed during regular working hours. Contractor will <br />not permit the performance of Work on a Saturday, <br />Sunday, or any legal holiday without Owner's written <br />consent (which will not be unreasonably withheld) given <br />after prior written notice to Engineer. <br />6.03 Services, Materials, and Equipment <br />A. Unless otherwise specified in the Contract Documents, <br />Contractor shall provide and assume full responsibility for <br />all services, materials, equipment, labor, transportation, <br />construction equipment and machinery, tools, appliances, <br />fuel, power, light, heat, telephone, water, sanitary <br />facilities, temporary facilities, and all other facilities and <br />incidentals necessary for the performance, testing, <br />start-up, and completion of the Work. <br />B. All materials and equipment incorporated into the <br />Work shall be as specified or, if not specified, shall be of <br />good quality and new, except as otherwise provided in the <br />Contract Documents. All special warranties and guaran- <br />tees required by the Specifications shall expressly run to <br />the benefit of Owner. If required by Engineer, Contractor <br />shall furnish satisfactory evidence (including reports of <br />required tests) as to the source, kind, and quality of <br />materials and equipment. <br />A. Contractor shall supervise, inspect, and direct the <br />Work competently and efficiently, devoting such attention C. All materials and equipment shall be stored, applied, <br />thereto and applying such skills and expertise as may be installed, connected, erected, protected, used, cleaned, and <br />(� necessary to perform the Work in accordance with the conditioned in accordance with instructions of the <br />Contract Documents. Contractor shall be solely applicable Supplier, except as otherwise may be provided <br />responsible for the means, methods, techniques, in the Contract Documents. <br />EJCDC C-700 Standard General Conditions of the Construction Contract. <br />Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved. <br />00700-18 <br />