Laserfiche WebLink
D. In the event that Engineer does not take action on a <br />Claim within said 30 days, the Claim shall be deemed <br />denied. <br />E. Engineer's written action under Paragraph 10.05.0 or <br />denial pursuant to Paragraphs 10.05.C.3 or 10.05.1) will <br />be final and binding upon Owner and Contractor, unless <br />Owner or Contractor invoke the dispute resolution <br />procedure set forth in Article 16 within 30 days of such <br />action or denial. <br />F. No Claim for an adjustment in Contract Price or <br />Contract Times will be valid if not submitted in <br />accordance with this Paragraph 10.05. <br />ARTICLE 11 - COST OF THE WORK; <br />ALLOWANCES; UNIT PRICE WORK <br />11.01 Cost of the Work <br />A. Costs Included: The term Cost of the Work means the <br />sum of all costs, except those excluded in Paragraph <br />11.01.13, necessarily incurred and paid by Contractor in <br />the proper performance of the Work. When the value of <br />any Work covered by a Change Order or when a Claim <br />for an adjustment in Contract Price is determined on the <br />basis of Cost of the Work, the costs to be reimbursed to <br />Contractor will be only those additional or incremental <br />costs required because of the change in the Work or <br />because of the event giving rise to the Claim. Except as <br />otherwise may be agreed to in writing by Owner, such <br />costs shall be in amounts no higher than those prevailing <br />in the locality of the Project, shall include only the <br />following items, and shall not include any of the costs <br />itemized in Paragraph 11.01.13. <br />1. Payroll costs for employees in the direct employ <br />of Contractor in the performance of the Work under <br />schedules of job classifications agreed upon by <br />Owner and Contractor. Such employees shall include, <br />without limitation, superintendents, foremen, and <br />other personnel employed full time at the Site. <br />Payroll costs for employees not employed full time <br />on the Work shall be apportioned on the basis of their <br />time spent on the Work. Payroll costs shall include, <br />but not be limited to, salaries and wages plus the cost <br />of fringe benefits, which shall include social security <br />contributions, unemployment, excise, and payroll <br />taxes, workers' compensation, health and retirement <br />benefits, bonuses, sick leave, vacation and holiday <br />pay applicable thereto. The expenses of performing <br />Work outside of regular working hours, on Saturday, <br />Sunday, or legal holidays, shall be included in the <br />above to the extent authorized by Owner. <br />cash discounts shall accrue to Contractor unless <br />Owner deposits funds with Contractor with which to <br />make payments, in which case the cash discounts <br />shall accrue to Owner. All trade discounts, rebates <br />and refunds and returns from sale of surplus materials <br />and equipment shall accrue to Owner, and Contractor <br />shall make provisions so that they may be obtained. <br />3. Payments made by Contractor to Subcontractors <br />for Work performed by Subcontractors. If required <br />by Owner, Contractor shall obtain competitive bids <br />from subcontractors acceptable to Owner and <br />Contractor and shall deliver such bids to Owner, who <br />will then determine, with the advice of Engineer, <br />which bids, if any, will be acceptable. If any <br />subcontract provides that the Subcontractor is to be <br />paid on the basis of Cost of the Work plus a fee, the <br />Subcontractor's Cost of the Work and fee shall be <br />determined in the same manner as Contractor's Cost <br />of the Work and fee as provided in this Paragraph <br />11.01. <br />4. Costs_ of special consultants (including but not <br />limited to Engineers, architects, testing laboratories, <br />surveyors, attorneys, and accountants) employed for <br />services specifically related to the Work. <br />5. Supplemental costs including the following: <br />a. The proportion of necessary transportation, <br />travel, and subsistence expenses of Contractor's <br />employees incurred in discharge of duties <br />connected with the Work. <br />b. Cost, including transportation and mainte- <br />nance, of all materials, supplies, equipment, <br />machinery, appliances, office, and temporary <br />facilities at the Site, and hand tools not owned by <br />the workers, which are consumed in the perfor- <br />mance of the Work, and cost, less market value, <br />of such items used but not consumed which <br />remain the property of Contractor. <br />c. Rentals of all construction equipment and <br />machinery, and the parts thereof whether rented <br />from Contractor or others in accordance with <br />rental agreements approved by Owner with the <br />advice of Engineer, and the costs of <br />transportation, loading, unloading, assembly, <br />dismantling, and removal thereof. All such costs <br />shall be in accordance with the terms of said <br />rental agreements. The rental of any such equip- <br />ment, machinery, or parts shall cease when the <br />use thereof is no longer necessary for the Work. <br />d. Sales, consumer, use, and other similar taxes <br />related to the Work, and for which Contractor is <br />2. Cost of all materials and equipment furnished liable, imposed by Laws and Regulations. <br />(( and incorporated in the Work, including costs of <br />transportation and storage thereof, and Suppliers' e. Deposits lost for causes other than negligence <br />field services required in connection therewith. All of Contractor, any Subcontractor, or anyone <br />EJCDC C-700 Standard General Conditions of the Construction Contract. <br />Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved. <br />00700-30 <br />