My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-018B
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-018B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2018 2:10:04 PM
Creation date
3/23/2016 8:37:03 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
01/22/2018
Control Number
2013-018B
Agenda Item Number
8.H.
Entity Name
West Regional Wastewater Treatment Plant
Subject
Anaerobic Tanks Odor Control System Design
Project Number
UCP - 4067
Bid Number
2013013
Alternate Name
WWTP
Supplemental fields
FilePath
H:\Indian River\Network Files\SL000008\S0002K7.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
11749
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
506
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
including final payment, will impose responsibility <br />on Engineer: <br />a. to supervise, direct, or control the Work, or <br />b. for the means, methods, techniques, <br />sequences, or procedures of construction, or the <br />safety precautions and programs incident thereto, <br />or <br />c. for Contractor's failure to comply with Laws <br />and Regulations applicable to Contractor's <br />performance of the Work, or <br />d. to make any examination to ascertain how or <br />for what purposes Contractor has used the <br />moneys paid on account of the Contract Price, or <br />e. to determine that title to any of the Work, <br />materials, or equipment has passed to Owner free <br />and clear of any Liens. <br />5. Engineer may refuse to recommend the whole or <br />any part of any payment if, in Engineer's opinion, it <br />would be incorrect to make the representations to <br />Owner stated in Paragraph 14.02.B.2. Engineer may <br />also refuse to recommend any such payment or, <br />because of subsequently discovered evidence or the <br />results of subsequent inspections or tests, revise or <br />revoke any such payment recommendation <br />previously made, to such extent as may be necessary <br />in Engineer's opinion to protect Owner from loss <br />because: <br />a. the Work is defective, or completed Work has <br />been damaged, requiring correction or replace- <br />ment; <br />b. the Contract Price has been reduced by <br />Change Orders; <br />c. Owner has been required to correct defective <br />Work or complete Work in accordance with <br />Paragraph 13.09; or <br />d. Engineer has actual knowledge of the <br />occurrence of any of the events enumerated in <br />Paragraph 15.02.A. <br />C. Payment Becomes Due <br />1. Ten days after presentation of the Application for <br />Payment to Owner with Engineer's recommendation, <br />the amount recommended will (subject to the <br />provisions of Paragraph 14.02.D) become due, and <br />when due will be paid by Owner to Contractor. <br />D. Reduction in Payment <br />1. Owner may refuse to make payment of the full <br />amount recommended by Engineer because: <br />a. claims have been made against Owner on <br />account of Contractor's performance or furnish- <br />ing of the Work; <br />b. Liens have been filed in connection with the <br />Work, except where Contractor has delivered a <br />specific bond satisfactory to Owner to secure the <br />satisfaction and discharge of such Liens; <br />c. there are other items entitling Owner to a <br />set-off against the amount recommended; or <br />d. Owner has actual knowledge of the occur- <br />rence of any of the events enumerated in <br />Paragraphs 14.02.B.5.a through 14.02.B.5.c or <br />Paragraph 15.02.A. <br />2. If Owner refuses to make payment of the full <br />amount recommended by Engineer, Owner will give <br />Contractor immediate written notice (with a copy to <br />Engineer) stating the reasons for such action and <br />promptly pay Contractor any amount remaining after <br />deduction of the amount so withheld. 'Owner shall <br />promptly pay Contractor the amount so withheld, or <br />any adjustment thereto agreed to by Owner and <br />Contractor, when Contractor corrects to Owner's <br />satisfaction the reasons for such action. <br />3. If it is subsequently determined that Owner's <br />refusal of payment was not justified, the amount <br />wrongfully withheld shall be treated as an amount <br />due as determined by Paragraph 14.02.C. I. <br />14.03 Contractor's Warranty of Title <br />A. Contractor warrants and guarantees that title to all <br />Work, materials, and equipment covered by any <br />Application for Payment, whether incorporated in the <br />Project or not, will pass to Owner no later than the time of <br />payment free and clear of all Liens. <br />14.04 Substantial Completion <br />A. When Contractor considers the entire Work ready for <br />its intended use Contractor shall notify Owner and <br />Engineer in writing that the entire Work is substantially <br />complete (except for items specifically listed by <br />Contractor as incomplete) and request that Engineer issue <br />a certificate of Substantial Completion. <br />B. Promptly after Contractor's notification, , Owner, <br />Contractor, and Engineer shall make an inspection of the <br />Work to determine the status of completion. If Engineer <br />does not consider the Work substantially complete, <br />Engineer will notify Contractor in writing giving the <br />reasons therefor. <br />EJCDC C-700 Standard General Conditions of the Construction Contract. <br />Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved. <br />00700-37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.