Laserfiche WebLink
° Addendum #14-94o <br />ITEMIZGD.B|DocHEDULG <br />PROJECT NAME:CRS1 RESURFACING L4NDROAD ToEASY STREET) <br />IRG PROJECt #1 132/BID #2013006 <br />nmnrn.SNAME xpnne,cnnsxmmIndustries, <br />n�nmc. <br />PROJECT TOTAL (IN WORDS) One Million Forty Nine Thousand Seven Hundred Eighty Seven and 70/100 Dollars <br />AG=Assembly LG=Lump Sum LF=Linear Foot Bu=Each SY= TN=Ton CY=Cubic Yard <br />mPublicworkskENnINEERINGDIVISION PRnJECmn132�CRmzEbndResurfacing Roseland RdmEasy St -SEE PRm Bid0031D-3 <br />_ <br />uf <br />'101-1 <br />MOBILIZATION (INCLUDES PUCBLIC CONSTRUCTION BOND) <br />LS <br />1 <br />$51,500.00 <br />$51,500:00 <br />102-1 <br />MAINTENANCE OF TRAFFIC <br />LS <br />1 <br />$47,000.00 <br />$47,000.00 <br />102-61 <br />BUSINESS SIGN (<12) (TEMPORARY) <br />EA <br />30 <br />$63.00 <br />$1,890.00 <br />104-1 <br />EROSION AND WATER POLLUTION CONTROL <br />LS <br />1 <br />$11.000.00 <br />$11,000.00 <br />285-7 <br />RECLAIMED ASPHALT BASE COURSE (FULL DEPTH RECLAMATION) <br />SY <br />32,765 <br />$4.35 <br />$142,527.75 <br />300-1 <br />ASPHALT EMULSION TYPE CSS -1h <br />GAL <br />87,126 <br />$2.65 <br />$230,883.90 <br />334-1-13 <br />SUPERPAVE ASPHALTIC CONCRETE I "SP -9.5 <br />SY <br />3168 <br />4.90 <br />$155,241.80 <br />334-1-13A <br />SUPERPAVE ASPHALTIC CONCRETE 1-1/2" SPA 2.5 <br />SY <br />31,682 <br />$6.30 <br />$199,596.60 <br />570-1-2 <br />PERFORMANCE TURF - SODDING (BAHIA) <br />Sy.- <br />8,855 <br />2 0 <br />$18,595.50 <br />570-1-2A <br />MATCH EXISTING) <br />$20,959.20 <br />663-74-15 <br />ECONOLITE VEHICLE DETECTOR ASSEMBLY <br />AS <br />3 <br />$3j.000.00 <br />$93,000.00 <br />700-20-11 <br />SINGLE POST SIGN (<12) (W4 -2R MERGE) <br />AS <br />I <br />t45Q.Qo <br />$450.00 <br />700-20-11 A <br />SINGLE POST SIGN (<12) (R3 -7R RIGHT LANE MUST TURN RIGHT) <br />AS <br />2 <br />$420.00 <br />$�40.00 <br />706-3 <br />RPM (BI-DIRECTIONAL (vVHITE/RED) <br />EA <br />280 <br />$4.2d <br />$1,176.00 <br />706-3 <br />RPM (BI-DIRECTIONAL (AMBER/AMBER) <br />-EA <br />64 <br />$4.20 <br />$226.80 <br />706'3 <br />RPM (BI-DIRECTIONAL (WHITE/MONO) <br />EA <br />7 <br />$4.20 <br />$29.40 <br />711-11-121 <br />THERMOPLASTIC,TRAFFIC STRIPE, WHITE,SOLID,6" <br />LF <br />9,830 <br />$1.00 <br />$9,830.00 <br />711-11-123 <br />THERMOPLAS�IC, TRAFFIC STRIPE,WHITE,SOLID, 12" <br />LF <br />345 <br />$2.20 <br />$759.00 <br />711-11-125 <br />THER , MOPLASTIC, TRAFFIC STRIPE,WHITE,SOLID,24" <br />LF <br />135 <br />$5.36 <br />$722.25 <br />11-11-141 <br />THERMOPLASTIC,TRAFFIC STRIPE,WHITE,SKIP,6" (6'-10') <br />LF <br />1-434 <br />0.30 <br />$430.20 <br />711-11-141A <br />THERMOPLASTIC,TRAFFIC STRIPE,WHITE,SKIP,6" (10'-30') <br />LF <br />7,991 <br />$0 <br />$2,397.30 <br />711-11-160 <br />THERIVIOPLASTIC, PAVEMENT MESSAGE (MERGE) <br />EA <br />2 <br />$175.00 <br />$350.00 <br />711-11-160A <br />TH ERMOPLASTIC, PAVEMENT MESSAGE (ONLY) <br />EA <br />2 <br />$175.00 <br />$350.00 <br />7li-11-170 <br />THERMOPLASTIC, STANDARD, WHITE, TURN ARROW. <br />EA <br />16 <br />$78.00 <br />$1,248.00 <br />711-11-170A <br />THERMOPLASTIC, STANDARD, WHITE, MERGE ARROW <br />EA <br />2 <br />$78. <br />$156.00 <br />711-11-221 <br />THERMOPLASTIC,TRAFFIC STRIPE,YELLOW,SOLID,6" <br />LF <br />8,628 <br />$1.00 <br />$8,628.00 <br />FA -1 <br />ORCEACCOUNT <br />LS <br />1 <br />50,000.00 <br />50,000.00 <br />C.R. 512 ASPHALT RESURFACING <br />TOTAL <br />$1,049,787.70 <br />PROJECT TOTAL (IN WORDS) One Million Forty Nine Thousand Seven Hundred Eighty Seven and 70/100 Dollars <br />AG=Assembly LG=Lump Sum LF=Linear Foot Bu=Each SY= TN=Ton CY=Cubic Yard <br />mPublicworkskENnINEERINGDIVISION PRnJECmn132�CRmzEbndResurfacing Roseland RdmEasy St -SEE PRm Bid0031D-3 <br />