Laserfiche WebLink
SECTION 00520 - Agreement (Public Works) <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br />State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called <br />OWNER) <br />Ranger Construction industriess, 1111C. <br />and <br />(hereinafter called CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, <br />agree as follows: <br />ARTICLE 1 -WORK <br />1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract <br />Documents. The Work is generally described as follows: <br />The proposed improvements to CR -512 consist of refurbishing (full depth <br />reclamation) of the dual eastbound lanes from Roseland Road to Easy Street. Also <br />included with the project is the installation of vehicular detector assemblies and the <br />signing and marking of the proposed resurfaced eastbound lanes. <br />ARTICLE 2 - THE PROJECT <br />2.01 The Project for which the Work under the Contract Documents may be the whole or only a <br />part is generally described as follows: <br />Project Name: CR 512 Resurfacing (East Bound Only) <br />(Roseland Road to Easy Street) <br />County Project Number: 1132 <br />Bid Number: 2013006 <br />Project Address: CR 512 Sebastian, Florida <br />ARTICLE 3 — ENGINEER <br />3.01 The Indian River County Public Works Department is hereinafter called the ENGINEER <br />and will act as OWNER's representative, assume all duties and responsibilities, and have <br />the rights and authority assigned to ENGINEER in the Contract Documents in connection <br />with the completion of the Work in accordance with the Contract Documents. <br />ARTICLE 4 - CONTRACT TIMES <br />4.01 Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness <br />for final payment as stated in the Contract Documents are of the essence of the Contract. <br />4.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br />A. The Work will be substantially completed on or before the 120th day after the date when <br />the Contract Times commence to run as provided in paragraph 2.03 of the General <br />Conditions, and completed and ready for final payment in accordance with paragraph <br />00520 - Agreement (Public Works) REV 04.07 (9) <br />00520 - 2 <br />C:\Documents and Seltings\mmclaughlin\Local Settings\Temporary Internet Files\Content.Outlook\24026LX8\00520 - Agreement (Public Works) REV 04-07 (9).doc <br />