My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-025.1
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-025.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2018 1:13:50 PM
Creation date
3/23/2016 9:11:48 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/17/2015
Control Number
2015-025.1
Agenda Item Number
8.F.
Entity Name
Timothy Rose Contracting
Subject
Sidewalk Improvements
Area
Old Dixie Highway Sidewalk Improvements 38th to 45th Street
Project Number
0845B
Bid Number
2014043
Alternate Name
Federal Aid Project - FM No. 423186-2-58-01
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000I\S0005E9.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
14585
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 of 5 <br /> CERTIFICATION OF ENGINEER: <br /> I certify that I have reviewed the above and foregoing Periodic Estimate for Partial <br /> Payment, that to the best of my knowledge and belief it appears to be a reasonably <br /> accurate statement of the work performed and/or material supplied by the Contractor. I am <br /> not certifying as to whether or not the Contractor has paid all subcontractors, laborers, <br /> materialmen and suppliers because I am not in a position to accurately determine that <br /> issue. <br /> Dated <br /> SIGNATURE <br /> CERTIFICATION OF INSPECTOR: <br /> I have checked the estimate against the Contractor's Schedule of Amounts for Contract <br /> Payments and the notes and reports of my inspections of the project. To the best of my <br /> knowledge, this statement of work performed and/or materials supplied appears to be <br /> reasonably accurate, that the Contractor appears to be observing the requirements of the <br /> Contract with respect to construction, and that the Contractor should be paid the amount <br /> requested above, unless otherwise noted by me. I am not certifying as to whether or not <br /> the Contractor has paid all subcontractors, laborers, materialmen and suppliers because I <br /> am not in a position to accurately determine that issue. <br /> Dated <br /> SIGNATURE <br /> **************************************************************************************************** <br /> [The Remainder of This Page Was Left Blank Intentionally] <br /> 00622-Contractor's Application for Payment-03-10 rev.doc <br /> 00622-4 <br /> F.\Public Works\ENGINEERING DIVISION PROJECTS\08458-Old Dixie Hwy Sidewalk(38th Ln-45th St)\Admlm\bid documents\Master Contract Documents\00622-Contractor's <br /> Application for Payment-03-10 rev.doc Rev.05/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.