My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-025.1
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-025.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2018 1:13:50 PM
Creation date
3/23/2016 9:11:48 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/17/2015
Control Number
2015-025.1
Agenda Item Number
8.F.
Entity Name
Timothy Rose Contracting
Subject
Sidewalk Improvements
Area
Old Dixie Highway Sidewalk Improvements 38th to 45th Street
Project Number
0845B
Bid Number
2014043
Alternate Name
Federal Aid Project - FM No. 423186-2-58-01
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000I\S0005E9.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
14585
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF CONTENTS <br /> Title Page <br /> ARTICLE 1 -DEFINITIONS AND TERMINOLOGY.....................................................................................................5 <br /> 1.01 Defined Terms...................................................................................................................................5 <br /> 1.02 Terminology.......................................................................................................................................7 <br /> ARTICLE2 - PRELIMINARY MATTERS......................................................................................................................8 <br /> 2.01 Delivery of Bonds..............................................................................................................................8 <br /> 2.02 Copies of Documents........................................................................................................................8 <br /> 2.03 Commencement of Contract Times; Notice to Proceed...................................................................8 <br /> 2.04 Starting the Work...............................................................................................................................8 <br /> 2.05 Before Starting Construction.............................................................................................................8 <br /> 2.06 Preconstruction Conference.............................................................................................................9 <br /> 2.07 Initial Acceptance of Schedules........................................................................................................9 <br /> ARTICLE 3-CONTRACT DOCUMENTS: INTENT, AMENDING, REUSE................................................................9 <br /> 3.01 Intent..................................................................................................................................................9 <br /> 3.02 Reference Standards........................................................................................................................10 <br /> 3.03 Reporting and Resolving Discrepancies...........................................................................................10 <br /> 3.04 Amending and Supplementing Contract Documents.......................................................................10 <br /> 3.05 Reuse of Documents.........................................................................................................................10 <br /> ARTICLE 4 -AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS; REFERENCE <br /> POINTS.....................................................................................................................................................11 <br /> 4.01 Availability of Lands...........................................................................................................................11 <br /> 4.02 Subsurface and Physical Conditions................................................................................................11 <br /> 4.03 Differing Subsurface or Physical Conditions.................................................:...................................11 <br /> 4.04 Underground Facilities......................................................................................................................12 <br /> 4.05 Reference Points...............................................................................................................................13 <br /> 4.06 Hazardous Environmental Condition at Site.....................................................................................13 <br /> ARTICLE 5-BONDS AND INSURANCE.....................................................................................................................14 <br /> 5.01 Performance, Payment, and Other Bonds........................................................................................14 <br /> 5.02 Licensed Sureties and Insurers........................................................................................................15 <br /> 5.03 Certificates of Insurance ...................................................................................................................15 <br /> 5.04 CONTRACTOR's Liability Insurance................................................................................................15 <br /> 5.05 OWNER's Liability Insurance............................................................................................................16 <br /> 5.06 Property Insurance............................................................................................................................16 <br /> 5.07 Waiver of Rights................................................................................................................................17 <br /> 5.08 Receipt and Application of Insurance Proceeds...............................................................................18 <br /> 5.09 Acceptance of Bonds and Insurance, Option to Replace.................................................................18 <br /> 5.10 Partial Utilization, Acknowledgment of Property Insurer...................................................................18 <br /> ARTICLE 6-CONTRACTOR'S RESPONSIBILITIES.................................................................................................18 <br /> 6.01 Supervision and Superintendence....................................................................................................18 <br /> 6.02 Labor, Working Hours.......................................................................................................................19 <br /> 6.03 Services, Materials, and Equipment.................................................................................................19 <br /> 6.04 Progress Schedule............................................................................................................................19 <br /> 6.05 Substitutes and"Or-Equals"..............................................................................................................19 <br /> 6.06 Concerning Subcontractors, Suppliers and Others..........................................................21 <br /> 00700-General Conditions REV 5-10-13.doc <br /> i <br /> 00700-2 <br /> F:\Public Works\ENGINEERING DMSION PROJECTS\0845B-Old Dixie Hwy Sidewalk(38th Ln-45th St)\Wdmim\bid documentsWaster Contract Documents\00700-General Conditions REV 5-10- <br /> 13 doe <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.