My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-025.1
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-025.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2018 1:13:50 PM
Creation date
3/23/2016 9:11:48 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/17/2015
Control Number
2015-025.1
Agenda Item Number
8.F.
Entity Name
Timothy Rose Contracting
Subject
Sidewalk Improvements
Area
Old Dixie Highway Sidewalk Improvements 38th to 45th Street
Project Number
0845B
Bid Number
2014043
Alternate Name
Federal Aid Project - FM No. 423186-2-58-01
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000I\S0005E9.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
14585
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contract Documents and check and verify pertinent working UFldeirstandiRg ameng the parties as to the <br /> figures therein and all applicable field measurements. <br /> Work and to dasicuss the SiGhedules FefeFred to On para- <br /> CONTRACTOR shall promptly report in writing to graph 2.05.13, PFOGedures for handliRg Shop ID i _ <br /> ENGINEER any conflict, error, ambiguity, or <br /> discrepancy which CONTRACTOR may discover and Payment, and maontael'n.g requiFed re <br /> shall obtain a written interpretation or clarification from <br /> ENGINEER before proceeding with any Work affected 2.07 Initial Acceptance of Schedules <br /> thereby; however, CONTRACTOR shall not be liable <br /> to OWNER or ENGINEER for failure to report any A. Unless otherwise provided in the Contract <br /> conflict, error, ambiguity, or discrepancy in the Documents, at least ten days before submission of the <br /> Contract Documents unless CONTRACTOR knew or first Application for Payment a conference attended by <br /> reasonably should have known thereof. CONTRACTOR, ENGINEER, and others as appropri- <br /> ate will be held to review for acceptability to ENGI- <br /> B. Preliminary Schedules: Within ten days after NEER as provided below the schedules submitted in <br /> the Effective Date of the Agreement(unless otherwise accordance with paragraph 2.05.B. CONTRACTOR <br /> specified in the General Requirements), CONTRAC- shall have an additional ten days to make corrections <br /> TOR shall submit to ENGINEER for its timely review: and adjustments and to complete and resubmit the <br /> schedules. No progress payment shall be made to <br /> 1. a preliminary progress schedule CONTRACTOR until acceptable schedules are <br /> indicating the times (numbers of days or dates) submitted to ENGINEER. <br /> for starting and completing the various stages <br /> of the Work, including any Milestones specified 1. The progress schedule will be <br /> in the Contract Documents; acceptable to ENGINEER if it provides an <br /> orderly progression of the Work to completion <br /> 2. a preliminary schedule of Shop within any specified Milestones and the <br /> Drawing and Sample submittals which will list Contract Times. Such acceptance will not <br /> each required submittal and the times for sub- impose on ENGINEER responsibility for the <br /> mitting, reviewing, and processing such progress schedule, for sequencing, scheduling, <br /> submittal; and or progress of the Work nor interfere with or <br /> relieve CONTRACTOR from CONTRACTOR's <br /> 3. a preliminary schedule of values for full responsibility therefor. <br /> all of the Work which includes quantities and <br /> prices of items which when added together 2. CONTRACTOR's schedule of Shop <br /> equal the Contract Price and subdivides the Drawing and Sample submittals will be <br /> Work into component parts in sufficient detail to acceptable to ENGINEER if it provides a <br /> serve as the basis for progress payments workable arrangement for reviewing and <br /> during performance of the Work. Such prices processing the required submittals. <br /> will include an appropriate amount of overhead <br /> and profit applicable to each item of Work. 3. CONTRACTOR's schedule of values <br /> will be acceptable to ENGINEER as to form <br /> Q. EvidenGe Of !RSUFanGe.- Before any Work a and substance if it provides a reasonable <br /> the Shte is started, CONTRACTOR and OWNER shall allocation of the Contract Price to component <br /> ear—deliver to the other, with dies to—eaGh parts of the Work. <br /> additional insured identifiedin the Supplernenta <br /> Conditions, GeFtifiGates of onsuFaRGe (and other ARTICLE 3 -CONTRACT DOCUMENTS: INTENT, <br /> e den% of insuFanGe whiGh either of them or any AMENDING, REUSE <br /> CONTRACTOR and OWNER respectively aFe <br /> 3.01 Intent <br /> A#*sle 6. <br /> A. The Contract Documents are comple- <br /> 2.06 Preconstruction Conference mentary; what is called for by one is as binding as if <br /> called for by all. <br /> A. Within 20 days after the GGRtrant Times star+ <br /> to run, but befeFe any WoFk at the Site is started, a B. It is the intent of the Contract Documents to <br /> GOnfereFlGe attended by QQNTRACTOR, ENGINEER, describe a functionally complete Project (or part there- <br /> and others as apprepFiate will be held te establish a to be constructed in accordance with the Contract <br /> 00700-General Conditions REV 5-10-13.doc <br /> 00700-9 <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\0845B-Old Dixie Hwy Sidewalk(38th Ln-45th St)\Admlm\bid documents\Master Contract Documents\00700-General Conditions <br /> REV 5-10-13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.