My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-025.1
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-025.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2018 1:13:50 PM
Creation date
3/23/2016 9:11:48 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/17/2015
Control Number
2015-025.1
Agenda Item Number
8.F.
Entity Name
Timothy Rose Contracting
Subject
Sidewalk Improvements
Area
Old Dixie Highway Sidewalk Improvements 38th to 45th Street
Project Number
0845B
Bid Number
2014043
Alternate Name
Federal Aid Project - FM No. 423186-2-58-01
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000I\S0005E9.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
14585
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARTICLE 11 - SUBSTITUTE AND "OR-EQUAL" ITEMS <br /> 11.01 The Contract, if awarded, will be on the basis of materials and equipment specified or <br /> described in the Bidding Documents without consideration of possible substitute or "or-equal' <br /> items. Whenever it is specified or described in the Bidding Documents that a substitute or "or- <br /> equal" item of material or equipment may be furnished or used by CONTRACTOR if acceptable to <br /> ENGINEER, application for such acceptance will not be considered by ENGINEER until after the <br /> Effective Date of the Agreement. The procedure for submission of any such application by <br /> CONTRACTOR and consideration by ENGINEER is set forth in the General Conditions and may <br /> be supplemented in the General Requirements. <br /> ARTICLE 12 - SUBCONTRACTORS, SUPPLIERS, AND OTHERS <br /> 12.01 If the Supplementary Conditions require the identity of certain Subcontractors, Suppliers, <br /> individuals, or entities to be submitted to OWNER in advance of a specified date prior to the <br /> Effective Date of the Agreement, the apparent Successful Bidder, and any other Bidder so <br /> requested, shall within five days after Bid opening, submit to OWNER a list of all such <br /> Subcontractors, Suppliers, individuals, or entities proposed for those portions of the Work for <br /> which such identification is required. Such list shall be accompanied by an experience statement <br /> with pertinent information regarding similar projects and other evidence of qualification for each <br /> such Subcontractor, Supplier, individual, or entity if requested by OWNER. If OWNER or <br /> ENGINEER, after due investigation, has reasonable objection to any proposed Subcontractor, <br /> Supplier, individual, or entity, OWNER may, before the Notice of Award is given, request apparent <br /> Successful Bidder to submit a substitute, without an increase in the Bid. <br /> 12.02 If apparent Successful Bidder declines to make any such substitution, OWNER may <br /> award the Contract to the next lowest Bidder that proposes to use acceptable Subcontractors, <br /> Suppliers, individuals, or entities. Declining to make requested substitutions will not constitute <br /> grounds for forfeiture of the Bid security of any Bidder. Any Subcontractor, Supplier, individual, or <br /> entity so listed and against which OWNER or ENGINEER makes no written objection prior to the <br /> giving of the Notice of Award will be deemed acceptable to OWNER and ENGINEER subject to <br /> revocation of such acceptance after the Effective Date of the Agreement as provided in paragraph <br /> 6.06 of the General Conditions. <br /> I 12.03 CONTRACTOR shall not be required to employ any Subcontractor, Supplier, individual, or <br /> entity against whom CONTRACTOR has reasonable objection. <br /> ARTICLE 13 - PREPARATION OF BID <br /> 13.01 The Bid form is included with the Bidding Documents. Additional copies may be obtained <br /> from the Issuing Office. <br /> 13.02 All blanks on the Bid form shall be completed by printing in ink or by typewriter and the <br /> Bid signed. A Bid price shall be indicated for each section, Bid item, alternative, adjustment unit <br /> price item, and unit price item listed therein, or the words "No Bid," "No Change," or "Not <br /> Applicable" entered. <br /> 00200-Instructions to Bidders FOR LAP PROJECTS ONLY REV 08-10.doc <br /> 00200-6 <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\08458-Old Dixie Hwy Sidewalk(38th Ln-45th St)\Admim\bid documents\LAP Documents\00200-Instructions to <br /> Bidders FOR LAP PROJECTS ONLY REV 08-10.doc Rev.05/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.