Laserfiche WebLink
C. If ENGINEER does not render a formal 2. Cost of all materials and equipment <br /> decision in writing within the time stated in paragraph furnished and incorporated in the Work, includ- <br /> 10.05.13, a decision denying the Claim in its entirety ing costs of transportation and storage thereof, <br /> shall be deemed to have been issued 31 days after and Suppliers' field services required in <br /> receipt of the last submittal of the claimant or the last connection therewith. All cash discounts shall <br /> submittal of the opposing party, if any. accrue to CONTRACTOR unless OWNER <br /> deposits funds with CONTRACTOR with which <br /> D. No Claim for an adjustment in Contract Price to make payments, in which case the cash <br /> or Contract Times (or Milestones) will be valid if not discounts shall accrue to OWNER. All trade <br /> submitted in accordance with this paragraph 10.05. discounts, rebates and refunds and returns <br /> from sale of surplus materials and equipment <br /> shall accrue to OWNER, and CONTRACTOR <br /> ARTICLE 11 - COST OF THE WORK; CASH shall make provisions so that they may be <br /> ALLOWANCES; UNIT PRICE WORK obtained. <br /> 3. Payments made by CONTRACTOR <br /> 11.01 Cost of the Work to Subcontractors for Work performed by <br /> Subcontractors. If required by OWNER, LON- <br /> A. Costs Included: The term Cost of the Work TRACTOR shall obtain competitive bids from <br /> means the sum of all costs necessarily incurred and subcontractors acceptable to OWNER and <br /> paid by CONTRACTOR in the proper performance of CONTRACTOR and shall deliver such bids to <br /> the Work. When the value of any Work covered by a OWNER, who will then determine, with the <br /> Change Order or when a Claim for an adjustment in advice of ENGINEER, which bids, if any, will be <br /> Contract Price is determined on the basis of Cost of acceptable. If any subcontract provides that the <br /> the Work, the costs to be reimbursed to Subcontractor is to be paid on the basis of Cost <br /> CONTRACTOR will be only those additional or of the Work plus a fee, the Subcontractor's <br /> incremental costs required because of the change in Cost of the Work and fee shall be determined <br /> the Work or because of the event giving rise to the in the same manner as CONTRACTOR's Cost <br /> Claim. Except as otherwise may be agreed to in of the Work and fee as provided in this para- <br /> writing by OWNER, such costs shall be in amounts no graph 11.01. <br /> higher than those prevailing in the locality of the <br /> Project, shall include only the following items, and 4. Costs of special consultants <br /> shall not include any of the costs itemized in para- (including but not limited to engineers, <br /> graph 11.01.13. architects, testing laboratories, surveyors, <br /> attorneys, and accountants) employed for <br /> 7 Payroll roc+c for employees in +ho services specifically related to the Work. <br /> manGe of the 1.4.lerl. under 613hedules of job 5. Supplemental costs including the <br /> agreed upc)n by OWNER and following: <br /> superintendents, feremen, a. The proportion of necessary trans- <br /> and- A_t..h.eF PeFSORnel employed full time at the travel, and subsistence expenses of <br /> Site. PaYFE)II GGStS for employees not employed CONTRACTOR's employees incurred in dis- <br /> charge of duties connected with the Work. <br /> thebasisP-)f their tome on the %^�.A-1:k. <br /> Payroll GA-StS 16h@11 inrdlude, but not be limited , b. Cost, including transportation and <br /> salaries and wages plus the ^oc+ of frin^o maintenance, of all materials, supplies, equip- <br /> ment, machinery, appliances, office, and <br /> temporary facilities at the Site, and hand tools <br /> payroll taxes, werkeFS' health not owned by the workers, which are consumed <br /> of <br /> and ro+iromon+ hon +c ,� <br /> h^nena cir•4 loayo in the performance of the Work, and cost, less <br /> market value, of such items used but not con- <br /> Tho expenses of norferminn VVE)Fk eutside of sumed which remain the property of CON- <br /> regular wGrking heuFs, en Saturday, Sunday, or <br /> legal holidays, shall be the above to <br /> the extent autherized by OWNER. <br /> 00700-General Conditions REV 5-10-13.doc <br /> 00700-32 <br /> F1Public Works\ENGINEERING DIVISION PROJECTS\084513-Old Dixie Hwy Sidewalk(38th Ln-45th St)\Admim\bid documents\Master Contract Documents\00700-General Conditions <br /> REV 5-10-13.doc <br />