Laserfiche WebLink
SECTION 00948 -Work Change Directive <br /> No. <br /> DATE OF ISSUANCE: EFFECTIVE DATE: <br /> OWNER: Indian River County <br /> CONTRACTOR: <br /> Project: Old Dixie Highway Sidewalk Improvements, 38th Lane to 45th Street <br /> OWNER's Contract No. 0845B <br /> Bid No. 2014032 <br /> FM No. 423186-2-58-01 <br /> You are directed to proceed promptly with the following changes: <br /> Description: <br /> Purpose of Work Change Directive: <br /> Attachments: (List documents supporting change) <br /> If OWNER or CONTRACTOR believe that the above change has affected Contract Price any <br /> Claim for a Change Order based thereon will involve one or more of the following methods as <br /> defined in the Contract Documents. <br /> Method of determining change in Method of determining change in <br /> Contract Prices Contract Times <br /> ❑ Unit Prices Q Contractor's Records <br /> ❑ Lump Sum Q Engineer's Records <br /> [l Other: J]Other: <br /> II By Change Order: II By Change Order: <br /> Estimated increase (decrease) of this Work Estimated increase (decrease) in Contract Times: <br /> Change Directive <br /> $ Substantial Completion: days; <br /> Ready for Final Completion: days. <br /> If the change involves an increase, the estimated If the change involves an increase, the estimated <br /> amount is not to be exceeded without further time is not to be exceeded without further <br /> authorization. authorization. <br /> ACCEPTED: RECOMMENDED: APPROVED: <br /> By: By: By: <br /> CONTRACTOR (Signature) ENGINEER (Signature) OWNER (Signature) <br /> Date: Date. Date: <br /> * * END OF SECTION <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\0845B-Old Dixie Hwy Sidewalk(38th Ln-45th St)Wdmim\bid <br /> documents\Master Contract Documents\00948-Work Change Directive Rev 06-2013.doc <br />