My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-025.1
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-025.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2018 1:13:50 PM
Creation date
3/23/2016 9:11:48 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/17/2015
Control Number
2015-025.1
Agenda Item Number
8.F.
Entity Name
Timothy Rose Contracting
Subject
Sidewalk Improvements
Area
Old Dixie Highway Sidewalk Improvements 38th to 45th Street
Project Number
0845B
Bid Number
2014043
Alternate Name
Federal Aid Project - FM No. 423186-2-58-01
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000I\S0005E9.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
14585
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLARIFICATIONS/CORRECTIONS/ADDITIONS/QUESTIONS: <br /> Pre-bid meeting—questions: <br /> QUESTION: Can the sidewalk be closed during construction? <br /> ANSWER: The sidewalk can be closed during construction. <br /> QUESTION: Does a temporary sidewalk need to be in place for the existing segments of sidewalk? <br /> ANSWER: Because the existing sidewalk segments are not continuous, both the existing sidewalks within the <br /> project area and proposed sidewalks can be closed during construction. No temporary sidewalk will need to be in <br /> place during construction. <br /> QUESTION: Does the Contractor need to be FDOT Certified? <br /> ANSWER: NO <br /> QUESTION: Does the concrete need to be from a FDOT Certified Plant? <br /> ANSWER: No <br /> QUESTION: Is there a preferred end of the sidewalk to start on? <br /> ANSWER:The preferred end to start construction is at 45th Street. Once the segment between 45th Street and 41�` <br /> Street is complete, It is preferred to open this segment to allow school access in the area. <br /> QUESTION: Is a pre-construction conditions video required? If so, is a third party required to take it? <br /> ANSWER:The CONTRACTOR shall make provisions, at his expense, for photographs and video tapes of all work <br /> areas just prior to construction, and for unusual conditions during construction.The photographs and videos shall <br /> show pertinent physical features along the line of construction. The purpose of the videos is to determine any <br /> damage to private or public property during construction. The video must be performed by a professional <br /> videographer. (See Section 01215 GENERAL QUALITY CONTROL, Division 1 GENERAL REQUIREMENTS of the <br /> Contract Documents). <br /> QUESTION: What happens in event of rain delays? <br /> ANSWER: In the event of rain delays, when mutually agreed upon by county and Contractor, additional time to the <br /> contract time can be added. <br /> QUESTION: What are the work hours? <br /> ANSWER: Work hours are from 7:00am to 5:00pm, Monday through Friday, except holidays. (See SC6.026of <br /> Section 00800-Supplementary Conditions the General Conditions in the Contract Documents) <br /> CLARIFICATION <br /> Line Item 527-1 DETECTABLE WARNING ON EXISTING WALKING SURFACES QUANTITY 8, is intended for use on <br /> existing walking surfaces. All other detectable warnings and curb cuts are included in the cost of the proposed <br /> sidewalk as indicated on the construction drawings. <br /> The Federal—Aid Project Wage Rates in the Contract Documents are current. <br /> ATTACHMENT: Pre-bid meeting minutes dated October 22, 2014 <br /> Page 2 of 3 <br /> F Tublic Works\ENGINEERING DIVISION PROJECTS\08456-Old Dixie Hwy Sidewalk(38th Ln-45th St)\Admim\bid documenw_4ddendums•Addendum No 1, 10-22-2014.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.