My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-025.1
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-025.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2018 1:13:50 PM
Creation date
3/23/2016 9:11:48 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/17/2015
Control Number
2015-025.1
Agenda Item Number
8.F.
Entity Name
Timothy Rose Contracting
Subject
Sidewalk Improvements
Area
Old Dixie Highway Sidewalk Improvements 38th to 45th Street
Project Number
0845B
Bid Number
2014043
Alternate Name
Federal Aid Project - FM No. 423186-2-58-01
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000I\S0005E9.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
14585
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
275-030-11 <br /> EQUAL oPr ORTUHITY OFFICE <br /> SECTION 00470 - EQUAL OPPORTUNITY FORMS 03111 <br /> Page 1 of 8 <br /> DBE Utilization <br /> The Department began its DBE race neutral program January 1, 2000. Contract specific goals are not placed on <br /> Federal/State contracts; however, the Department has an overall 8.18% DBE goal it must achieve. In order to assist <br /> contractors in determining their DBE commitment level, the Department has reviewed the estimates for this letting. <br /> As you prepare your bid, please monitor potential or anticipated DBE utilization for contracts. When the low bidder <br /> executes the contract with the Department, information will be requested of the contractor's anticipated DBE participation <br /> for the project.While the utilization is not mandatory in order to be awarded the project, continuirr utilization of DBE firms <br /> on contracts supports the success of Florida's Voluntary DBE Program, and supports contractors' Equal Employment <br /> opportunity and DBE Affirmative Action Programs. <br /> NOTE:Any project listed as 0%DBE availability does not mean that a DBE may not be used on 14at project.A 0% DBE <br /> availability may have been established due to any of the following reasons: limited identified subcontracting opportunities, <br /> minimal contract days, and/or small contract dollar amount. Contractors are encouraged to identify any opportunities to <br /> subcontract to DBEs. <br /> If you have any questions regarding this information, please contact the Equal Opportunity Office at(850)414-4747. <br /> DBE Reporting <br /> ifY ou are the prime contractor on a project, complete the attached Anticipated DBE Participation Statement and submit <br /> the information at the pre-construction or pre-work conference forallfederal and state funded protects. This will not <br /> become a mandatory part of the contract. It will assist the Department in tracking and reporting planned or estimated <br /> DBE utilization. During the contract,the prime contractor is required to report actual payments to all subcontractors <br /> through the web-based Equal Opportunity Reporting System (FORS), BizWeb. <br /> All DBE payments must be reported whether or not you initially planned to utilize the company. In order for our race <br /> neutral DBE Program to be successful,your cooperation is imperative. If you have any questions concerning the <br /> completion or submission of this information,contact the FDOT E00 at(850)414-4747. <br /> Bid Opportunity List <br /> The Federal DBE Program requires States to maintain a database of all firms that are participating or attempting to <br /> participate on FDOT-assisted contracts. The list must include all firms that bid on prime contracts or bid or quote <br /> subcontracts on FDOT-assisted projects, including both DBEs and non-DBEs. <br /> A form is included to record bidders' information for ALL subcontractors or sub-consultants who quoted to you for specific <br /> projects for this letting. <br /> a <br /> If a contractor quoted to you for more than one project you only need list that contractor once. If you have submitted a <br /> bidder's list to the Department previously, you need only list new companies who have quoted to you or requested to be <br /> on specific projects. If you do not know the answers to numbers 2,3, 4, or 5 you may leave them blank and the <br /> Depariment will complete them. This information should be returned with your bid package or proposal,package or <br /> submitted to the Equal Opportunity Office within three days of your submission. It can be mailed or faxed. <br /> Please reply to: Florida Department of Transportation <br /> Equal Opportunity Office <br /> 605 Suwannee Street, MS 65 <br /> l; Tallahassee, FL 32399-0450 <br /> (850)414-4747 <br /> (850)414-4879 <br /> a <br /> 1� <br /> 470-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.