My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-025.1
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-025.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2018 1:13:50 PM
Creation date
3/23/2016 9:11:48 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/17/2015
Control Number
2015-025.1
Agenda Item Number
8.F.
Entity Name
Timothy Rose Contracting
Subject
Sidewalk Improvements
Area
Old Dixie Highway Sidewalk Improvements 38th to 45th Street
Project Number
0845B
Bid Number
2014043
Alternate Name
Federal Aid Project - FM No. 423186-2-58-01
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000I\S0005E9.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
14585
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Instructions for Form: <br /> The contractor must provide enough information through a Schedule "A"spreadsheet to determine which pay-items)are <br /> being sublet, the amounts, and cost. For sublet calculations, the amount will be calculated based on the actual contract <br /> unit price(s)unless there is a partial sublet. For partial sublets, use the unit prices from the actual sub-contract. <br /> 1) Enter the Date of the certification of sublet work was prepared. <br /> 2) Enter the sequential number of the request starting with number 1. <br /> 3) Enter the Federal Aid Project number for the Prime Contractor if any. <br /> 4) Enter the Financial Project Identification number of the Contract. <br /> 5) Enter the Contract number of the Contract with the Department. <br /> 6) Enter the County name where the work is being performed. <br /> 7) Enter the Name of the Prime Contractor. <br /> 8) Enter the FEID number of the Prime Contractor. <br /> 9) Enter the Original Contract dollar amount(round to nearest whole dollar). <br /> 10) Enter a "Y" in the space marked Change if any information on the line has changed since the <br /> previous certification of sublet work was prepared. Otherwise, leave blank. <br /> 11) Enter the Subcontractor names. Enter all the subcontractor(s)regardless of their tier. <br /> 12) Enter the tier number for the subcontractor. If the subcontractor works directly for the Prime <br /> Contractor, enter a "'I". If he works one level below, enter a "2" and so on. <br /> 13) Enter the FEID number of the Subcontractor(s). <br /> 14) Enter the name of the pertinent Contractor or Subcontractor that hired subcontractor. <br /> 15) Enter a short description of the work to be performed. <br /> 16) Enter a"P" if any pay-item for the sublet is a partial sublet. <br /> 17) Enter the DBE status for the subcontractor: "D"for DBE, "N"for non-DBE. <br /> 18) The Department may require subcontractor to be prequalified with the Department as described <br /> in the Special Provisions and the Bid Solicitation Notice whenever construction projects contain <br /> certain classes of work that require specific expertise. <br /> 19) One(1)copy of this form shall be submitted to the District Office by the contractor. <br /> 20) To be signed by principal of the firm or someone with the delegated authority and notarized. <br /> 00500-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.