Laserfiche WebLink
} <br /> SECTION 00520 -Agreement(Public Works) <br /> THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br /> State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called <br /> OWNER) <br /> and_Timothy Rose Contracting Inc <br /> (hereinafter called CONTRACTOR). <br /> OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, <br /> agree as follows: <br /> ARTICLE 1 -WORK <br /> 1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract <br /> Documents. The Work is generally described as follows: <br /> The project will consist of the construction of a 5' wide concrete sidewalk along the <br /> east side of Old Dixie Highway between 38th Lane and 45th Street, a gross length of <br /> approximately 4,500 linear feet. <br /> ARTICLE 2 -THE PROJECT <br /> 2.01 The Project for which the Work under the Contract Documents may be the whole or only a <br /> part is generally described as follows: <br /> Project Name: Old Dixie Highway Sidewalk Improvements, 38th Lane to 45th <br /> Street <br /> County Project Number: 0845B <br /> FM Number: 423186-2-58-01 <br /> Bid Number: 2014032 <br /> Project Address: Old Dixie Highway from 381h Lane to 45tt' Street, Indian River <br /> County, FL <br /> ARTICLE 3—ENGINEER <br /> 3.01 The Indian River County Public Works Department is hereinafter called the ENGINEER <br /> and will act as OWNER's representative, assume all duties and responsibilities, and have <br /> the rights and authority assigned to ENGINEER in the Contract Documents in connection <br /> with the completion of the Work in accordance with the Contract Documents. <br /> ARTICLE 4 -CONTRACT TIMES <br /> 4.01 Time of the Essence <br /> A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness <br /> for final payment as stated in the Contract Documents are of the essence of the Contract. <br /> 4.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br /> A. The Work will be substantially completed on or before the 60th day after the date when the <br /> Contract Times commence to run as provided in paragraph 2.03 of the General <br /> Conditions, and completed and ready for final payment in accordance with paragraph <br /> 00520-Agreement(Public Works)FOR LAP PROJECTS-FOR CONTRACTOR <br /> 00520-2 <br /> F:\Purchasing\Bids\2013-2014 FY(2014000)\2014032 Old Dixie Hwy Sidewalks\00520-Agreement(Public Works)FOR LAP PROJECTS-FOR CONTRACTOR.doc <br />