My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-025.1
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-025.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2018 1:13:50 PM
Creation date
3/23/2016 9:11:48 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/17/2015
Control Number
2015-025.1
Agenda Item Number
8.F.
Entity Name
Timothy Rose Contracting
Subject
Sidewalk Improvements
Area
Old Dixie Highway Sidewalk Improvements 38th to 45th Street
Project Number
0845B
Bid Number
2014043
Alternate Name
Federal Aid Project - FM No. 423186-2-58-01
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000I\S0005E9.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
14585
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 of 5 <br /> Classifications listed under an "SU" identifier were derived <br /> from survey data by computing average rates and are not union <br /> rates; however, the data used in computing these rates may <br /> include both union and non-union data. Example: SULA2004-007 <br /> 5/13/2010. SU indicates the rates are not union majority rates, <br /> LA indicates the State of Louisiana; 2004 is the year of the <br /> survey; and 007 is an internal number used in producing the <br /> wage determination. A 1993 or later date, 5/13/2010, indicates <br /> the classifications and rates under that identifier were issued <br /> as a General Wage Determination on that date. <br /> Survey wage rates will remain in effect and will not change <br /> until a new survey is conducted. <br /> ---------------------------------------------------------------- <br /> WAGE DETERMINATION APPEALS PROCESS <br /> 1. ) Has there been an initial decision in the matter? This can <br /> be: <br /> { an existing published wage determination <br /> * a survey underlying a wage determination <br /> * a Wage and Hour Division letter setting forth a position on <br /> a wage determination matter <br /> * a conformance (additional classification and rate) ruling <br /> On survey related matters, initial contact, including requests <br /> for summaries of surveys, should be with the Wage and Hour <br /> Regional Office for the area in which the survey was conducted <br /> because those Regional Offices have responsibility for the <br /> Davis-Bacon survey program. If the response from this initial <br /> contact is not satisfactory, then the process described in 2. ) <br /> and 3. ) should be followed. <br /> With regard to any other matter not yet ripe for the formal <br /> process described here, initial contact should be with the <br /> Branch of Construction Wage Determinations. Write to: <br /> Branch of Construction Wage Determinations <br /> Wage and Hour Division <br /> U.S. Department of Labor <br /> 200 Constitution Avenue, N.W. <br /> Washington, DC 20210 <br /> 2.) If the answer to the question in 1. ) is yes, then an <br /> interested party (those affected by the action) can request <br /> review and reconsideration from the Wage and Hour Administrator <br /> (See 29 CFR Part 1.8 and 29 CFR Part 7) . Write to: <br /> Wage and Hour Administrator <br /> U.S. Department of Labor <br /> 200 Constitution Avenue, N.W. <br /> Washington, DC 20210 <br /> The request should be accompanied by a full statement of the <br /> interested party's position and by any information (wage <br /> payment data, project description, area practice material, <br /> etc. ) that the requestor considers relevant to the issue. <br /> file:///C:/Users/cn4O8lk/AppData/LocaVremp/LowfI TOCLJCL.htm 3/12/2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.