My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-000 (2)
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-000 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2018 12:54:31 PM
Creation date
3/23/2016 9:12:18 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
08/20/2013
Control Number
2013-000
Subject
Fertilizer and Landscape Management
Area
Old Dixie Highway Sidewalk 38th Lane to 45th Street
Alternate Name
Sidewalk Improvements
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000I\S0005EA.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
14586
Document Relationships
2013-014
(Agenda)
Path:
\Ordinances\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The contractor will also be required to provide, prior to incorporating the materials into the Project, <br /> certifications from the producer of steel or iron, or any produce containing steel or iron as a component, <br /> stating that all steel or iron furnished was produced entirely within the United States or was produced <br /> within the United States except for minimal quantities of foreign steel and iron valued at ($insert actual <br /> value). <br /> 18. DISADVANTAGED BUSINESS ENTERPRISE PROGRAM <br /> (1) Policy. The contractor shall ensure that Disadvantaged Business Enterprises, as <br /> defined in 49 C.F.R. Part 26, as amended, shall have the opportunity to participate in the performance of this <br /> project. In this regard, the contractor shall take all necessary and reasonable steps in accordance with <br /> applicable federal and state regulations, to ensure that the Disadvantaged Business Enterprises have the <br /> opportunity to compete for and perform contracts or subcontracts with respect to this Project. <br /> (2) DBE Availability Goal Percentage. The DBE Goal Percentage for this project is 7.9%. <br /> This DBE availability goal percentage is not a mandatory contract specification, but it is a guide to inform <br /> the contractor of the work that could reasonably be contracted to a DBE. <br /> (3) DBE Certification. Only DBE firm(s) certified by the FDOT Equal Opportunity Office <br /> shall be considered disadvantaged business enterprises for the purposes of this bid and any resulting <br /> contract. To verify whether a firm is certified as a DBE for the work being performed, the contractor must <br /> refer to the DBE Directory published by the FDOT Equal Opportunity Office on the Internet at: <br /> www.dot.state.fl.us/egualopportunitVoffice/or through the Florida Unified Certification Program at <br /> www.bipincwebapps.com/biznetflorida/. If the Internet is not available, call the Equal Opportunity Office <br /> for verification at (850)414-4747. <br /> (4) Anticipated DBE Participation Statement. Contractor shall complete and submit the <br /> Anticipated DBE Participation Statement prior to the pre-construction conference through the FDOT Equal <br /> Opportunity Office on the Internet. A hard copy of the Statement should also be provided the pre-construction <br /> conference. The Statement must only include companies certified as a DBE. The Statement can and should <br /> be updated when additions or deletions are made through the life of the contract. This will not become a <br /> mandatory part of the contract. <br /> When reporting anticipated DBE utilization or actual payments,the following guidelines prescribed in <br /> the 49 C.F.R. Part 26 shall apply: <br /> a) When a DBE participates in a contract, count only the value of the work actually <br /> performed by the DBE toward DBE participation. <br /> b) Count expenditures to a DBE contractor toward DBE goals only if the DBE is <br /> performing a commercially useful function on the project. <br /> C) Follow the DBE reporting guidelines established by FDOT. <br /> (5) Reporting. Contractor shall report monthly, through the FDOT Equal Opportunity <br /> Reporting System on the FDOT website, actual payment, retainage, DBE status and work type of all <br /> subcontractors and major suppliers. Contractor shall develop a record keeping system to monitor DBE <br /> participation including the following: <br /> i) number and dollar value of contracts awarded to DBE subcontractors. <br /> ii) a description of the general categories of subcontracts awarded to DBEs. <br /> iii) the specific efforts employed to identify and award subcontracts to DBEs. <br /> All records relating to DBE participation and subcontracts shall be maintained for a period of five (5) years <br /> following acceptance of final payment. All such records shall be available for inspection by the County, FDOT <br /> 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.