My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-000 (2)
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-000 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2018 12:54:31 PM
Creation date
3/23/2016 9:12:18 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
08/20/2013
Control Number
2013-000
Subject
Fertilizer and Landscape Management
Area
Old Dixie Highway Sidewalk 38th Lane to 45th Street
Alternate Name
Sidewalk Improvements
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000I\S0005EA.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
14586
Document Relationships
2013-014
(Agenda)
Path:
\Ordinances\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
schedule. The County may also grant an extension of Contract Time when a critical path item of work is <br /> delayed by factors not reasonably anticipated or foreseeable at the time of bid or if failure of the County to <br /> fulfill an obligation under the contract results in delays to the schedule critical path. The County may consider <br /> the delays in delivery of materials or equipment that affect progress on a critical item of work as the basis for <br /> granting a time extension if such delays are beyond the control of the Contractor. Requests for time <br /> extensions due to delay in the delivery of custom manufactured equipment or fixtures will not be considered <br /> unless the contractor furnishes documentation that the order was placed in a timely manner and the lack of <br /> such equipment cased a delay in progress on a critical item. <br /> Extensions of Contract Time will not be granted for delays due to the fault or negligence of the <br /> Contractor. <br /> No allowance for inclement weather should be made in establishing the Contract Time. The County <br /> may grant time extensions on a day for day basis for delays caused only by inclement weather conditions that <br /> prevent the contractor from productively performing critical path items where: (i) the contractor is unable to <br /> work at least 50% of the day on a pre-determined critical path item due to the weather; or (ii) the contractor <br /> must make major repairs to work damaged by weather provided that the damage is not due to the contractor's <br /> failure to perform and that the contractor is unable to work at least 50%of the day on pre-determined critical <br /> path items. <br /> 24. LIQUIDATED DAMAGES <br /> Applicable liquidated damages will be assessed in the following amount: $758.00 per day <br /> 25. CONTRACT CLAIMS BY CONTRACTOR <br /> Should the contractor intend to file a claim for additional monetary compensation, time or other <br /> adjustments to the contract and the County disputes the contractor's entitlement to the claim or the impact of <br /> the claim, Contractor must provide written notification to the county of contractor's intent to file a claim. This <br /> notice must be given before the contractor begins any work on which the claim is based. Failure of the <br /> contractor to notify the County before beginning work on any disputed items waives the contractor's right to <br /> claim. The contractor's notice of intent to file a claim should contain: <br /> (1) A statement as to what changed, including a description of the nature and extent of the <br /> change. <br /> (2) An indication of who directed or what caused the change. <br /> (3) A description of how the change has or will impact the contractor, including reference to any <br /> impacted critical activities on the contractor's latest accepted schedule update. <br /> (4) A statement of damages, or an estimate of damages if available, detailing the amount of <br /> compensation, time and/or other adjustment to the contract that is being requested. <br /> 26. DRUG-FREE WORKPLACE CERTIFICATION <br /> In accordance with Florida Statute 287.087, the bidder shall certify that it has and will maintain a drug-free <br /> workplace. The bidder shall complete and submit with its bid proposal the attached certification. Failure to <br /> include an executed certification may cause the bid proposal to be considered non-responsive. <br /> 27. SUSPENSION AND DEBARMENT <br /> The bidder shall complete and submit with its bid proposal the certification regarding debarment form included <br /> in this package, or an explanation as provided herein. The inability to provide the certification will not <br /> necessarily result in denial of participation in the project. The bidder shall submit an explanation of why it <br /> cannot provide the requested certification, which will be considered in evaluation of the bidder's bid package. <br /> However, failure by a bidder to furnish a certification or an explanation shall disqualify such bidder from this <br /> 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.