My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-000 (2)
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-000 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2018 12:54:31 PM
Creation date
3/23/2016 9:12:18 AM
Metadata
Fields
Template:
Official Documents
Document Relationships
2013-014
(Agenda)
Path:
\Ordinances\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
storage at the project site prior to installation. <br /> 1.5 PROJECT PHOTOGRAPHS/VIDEOS <br /> A. The CONTRACTOR shall make provisions, at his expense, for photographs and <br /> video tapes of all work areas just prior to construction, and for unusual conditions <br /> during construction. The photographs and videos shall show pertinent physical <br /> features along the line of construction. The purpose of the videos is to determine <br /> any damage to private or public property during construction. The video must be <br /> performed by a professional videographer. <br /> B. Pre-Construction Photographs and Video: <br /> 1. Contractor shall provide the Owner with photographs and video record and one <br /> copy of the existing conditions prior to construction. These photographs and <br /> videos shall be a standard DVD format and shall be narrated. <br /> 2. The photographs and video shall include, but not be limited to, the following <br /> items shown in a clear manner: <br /> 1) All existing features within the right-of-way. <br /> 2) All existing features within the temporary construction easement. <br /> 3) All existing features within permanent easements. <br /> 4) All existing features adjacent to any construction. <br /> 3. Detail of the photographs and video shall be such that the following examples <br /> shall be clear and visible: <br /> 1) Cracks in walls. <br /> 2) Condition of fencing. <br /> 3) Condition of planted areas and types of vegetation. <br /> 4) Condition of sodded areas. <br /> 5) Conditions of sprinkler systems and associated controls and wiring. <br /> 6) Condition of signs. <br /> 7) Conditions of lighting and associated wiring. <br /> 8) Significant detail of any pre-existing damages physical features shall be <br /> shown. The coverage of the photographs and video should include the <br /> limits of effects of the use of vibratory rollers. <br /> 9) These photographs and video record shall be presented and approved <br /> by the Owner prior to the Notice to Proceed. A copy shall be kept in the <br /> Contractor's field office. <br /> 10)Payment — No additional payment will be made for this work. <br /> + + END OF SECTION + + <br /> 01215-2 01215 General Quality Control <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\0845B-Old Dixie Hwy Sidewalk(38th Ln-45th St)Wdmim\bid <br /> documents\Master <br /> Contract <br /> Documents\01215 <br /> General Quality.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.