My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-000 (2)
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-000 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2018 12:54:31 PM
Creation date
3/23/2016 9:12:18 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
08/20/2013
Control Number
2013-000
Subject
Fertilizer and Landscape Management
Area
Old Dixie Highway Sidewalk 38th Lane to 45th Street
Alternate Name
Sidewalk Improvements
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000I\S0005EA.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
14586
Document Relationships
2013-014
(Agenda)
Path:
\Ordinances\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Contractor shall be responsible for performing daily inspections, including <br /> weekends and holidays, with some inspections at nighttime, of the installations on the <br /> project and replace all equipment and devices not conforming with the approved <br /> standards during that inspection. The project personnel will be advised of the <br /> schedule of these inspections and be given the opportunity to join in the inspection as <br /> is deemed necessary. <br /> C. TRAFFIC CONTROL - STANDARDS: The FDOT Design Standards For Design <br /> Construction, Maintenance and Utility Operations On The State Hiqhway System, <br /> Edition as dated on the plans set forth the basic principles and prescribes minimum <br /> standards to be followed in the design, application, installation, maintenance and <br /> removal of all traffic control devices and all warning devices and barriers which are <br /> necessary to protect the public and workmen from hazards within the project limits. <br /> The standards established in the aforementioned manual constitute the minimum <br /> requirements for normal conditions, and additional traffic control devices warning <br /> devices, barriers or other safety devices will be required where unusual, complex or <br /> particularly hazardous conditions exist. <br /> The above referenced standards were developed using F.H.W.A., U.S.D.O.T. Manual <br /> on Uniform Traffic Control Devices (MUTCD). <br /> D. TRAFFIC CONTROL DEVICES, WARNING DEVICES AND BARRIERS - <br /> INSTALLATION: The responsibility for installation and maintenance of adequate traffic <br /> control devices, warning devices and barriers, for the protection of the travel in public <br /> and workmen, as well as to safeguard the work area in general shall rest with the <br /> Contractor. Consideration shall be given to recommendations of the Engineer. The <br /> required traffic control devices, warning devices and barriers shall be erected by the <br /> Contractor prior to creation of any hazardous condition and in conjunction with any <br /> necessary re-routing of traffic. The Contractor shall immediately remove, turn or cover <br /> any devices or barriers which do not apply to existing conditions. All traffic control <br /> devices shall conform to MUTCD standards and shall be clean and relatively <br /> undamaged. Damaged devices diminishing legibility and recognition, during either <br /> night or day conditions, are not acceptable for use. <br /> E. NO WAIVER OF LIABILITY: The Contractor shall conduct his operations in such a <br /> manner that no undue hazard will result due to the requirements of this article, and the <br /> procedures and policies described therein shall in no way act as a waiver of any of the <br /> terms of the liability of the Contractor or his surety. <br /> F. Contractor's Maintenance of Traffic Plan shall maintain continuous vehicular traffic on <br /> Old Dixie Highway at all times. <br /> Item of Payment <br /> Payment for the work specified in this item shall be made under: <br /> Bid Item No. 102-1 - Maintenance of Traffic - Lump Sum <br /> 01025-12 Technical Specifications <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\08456-Old Dixie Hwy Sidewalk(38th Ln-45th St)\Admim\bid <br /> documents\Master Contract Documents\Technical Specifications.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.