Laserfiche WebLink
quantities or at levels which are or may be potentially harmful or injurious to human health or <br /> welfare, animal or plant life, or property or which unreasonably interfere with the enjoyment of <br /> life or property, including outdoor recreation unless authorized by applicable law." <br /> 5. 1 understand and agree that in addition to the definition set forth in Item 4 above, <br /> "pollution" is also defined by Florida Administrative Code 62-302.530 and as may be <br /> further defined in the Indian River County permit(s). <br /> 6. 1 understand that Indian River County requires the design, installation, and maintenance of <br /> proper erosion control measures at all times during construction until complete <br /> stabilization is achieved at the project site. Contractor understands that this requirement <br /> is for this project regardless of the project size. <br /> 7. 1 understand that there are civil and criminal penalties for pollution listed in Florida Statutes <br /> Ch. 403.141 and Ch. 403.161 and that there are other penalties listed in Indian River <br /> County's permits, including but not limited to, Indian River County issuing a Cease and <br /> Desist Order for the project. Contractor understands that it may be liable for these and <br /> other penalties if offsite pollution occurs as a result of activities associated with the <br /> Project. <br /> 8. Transfer of Ownership or County Issued Permits: <br /> (a) Transfer of Interest in Real Property: Within twenty-one (21) days of any transfer of <br /> ownership or control of the real property at which the permitted activity, facility, or <br /> system is located or authorized, the Contractor shall notify in writing, both the Indian <br /> River County Engineering Division and the Indian River County Stormwater Division <br /> of the transfer. Contractor shall provide the name, mailing address, and telephone <br /> number of the transferee and a copy of the instrument effectuating the transfer. Said <br /> notification is in addition to notifying the County Attorney's Office as required by <br /> County Code. <br /> (b) Transfer of a County Permit. To transfer a County issued permit, Contractor must <br /> provide (1) the information required in Item 8(a); (2) a written statement from the <br /> proposed transferee that it will be bound by all terms and conditions of the permit; <br /> and (3) a new "Contractor's Affidavit" form properly executed by the transferee. Upon <br /> proper receipt of these items the County shall transfer the permit to the transferee. <br /> (c) Contractor is encouraged to request a permit transfer prior to the sale or legal <br /> transfer of the real property at which a permitted facility, system, or activity is located <br /> or authorized. However, the transfer shall not be effective prior to the sale or legal <br /> transfer. <br /> (d) An "Illicit Discharge Sign" must be present at the site at the time of transfer. <br /> Replacement or additional signs may be obtained from the Indian River County <br /> Public Works Department at a cost of $30.00 per sign. <br /> [The remainder of this page was left blank intentionally] <br /> 01025-21 Technical Specifications <br /> F1Public Works\ENGINEERING DIVISION PROJECTS\084513-Old Dixie Hwy Sidewalk(38th Ln-45th St)\Admim\bid <br /> documents\Master Contract Documents\Technical Specifications.doc <br />