120-7.2.1 Earthwork Category 1 and 2 Density Requirements: Reduce the <br /> minimum required density from 100% to 95% of AASHTO T99 Method C for all earthwork <br /> items requiring densities. <br /> 120-7.2.2 Earthwork Category 3 Density Requirements: Except for <br /> embankments constructed by the hydraulic method as specified in 120-6.3, and for the <br /> material placed outside the standard minimum slope as specified in 120-6.2.4, and for other <br /> areas specifically excluded herein, compact each layer of the material used in the formation of <br /> embankments to a density of at least 100% of the maximum density as required by AASHTO <br /> T 99, Method C. Uniformly compact each layer using equipment that will achieve the required <br /> density, and as compaction operations progress, shape and manipulate each layer as <br /> necessary to ensure uniform density throughout the embankment. <br /> 120-7.2.3 Compaction Over Unstable Foundations: Where the embankment <br /> material is deposited in water or on low swampy ground, and in a layer thicker than 12 inches <br /> (as provided in 120-6.2.2), compact the top 6 inches (compacted thickness) of such layer to <br /> the density as specified in 120-9.5. <br /> 120-7.2.4 Compaction Where Plastic Material Has Been Removed: Where <br /> unsuitable material is removed and the remaining surface is of the A-4, A-5, A-6, or A-7 Soil <br /> Groups, as determined by the Engineer, compact the surface of the excavated area by rolling <br /> with a sheepsfoot roller exerting a compression of at least 250 psi on the tamper feet, for the <br /> full width of the roadbed (subgrade and shoulders). Perform rolling before beginning any <br /> backfill, and continue until the roller feet do not penetrate the surface more than 1 inch. Do <br /> not perform such rolling where the remaining surface is below the normal water table and <br /> covered with water. Vary the procedure and equipment required for this operation at the <br /> discretion of the Engineer. <br /> 120-7.2.5 Compaction of Material To Be Used In Base, Pavement, or <br /> Stabilized Areas: Do not compact embankment material which will be incorporated into a <br /> pavement, base course, or stabilized subgrade, to be constructed as a part of the same <br /> Contract. <br /> 120-7.2.6 Compaction of Grassed Shoulder Areas: For the upper 6 inch layer <br /> of all shoulders which are to be grassed, since no specific density is required, compact only to <br /> the extent directed. <br /> 120-7.2.7 Compaction of Grassed Embankment Areas: For the outer layer of <br /> all embankments where plant growth will be established, do not compact. Leave this layer in a <br /> loose condition to a minimum depth of 6 inches for the subsequent seeding or planting <br /> operations. <br /> 120-7.3 Compaction of Subgrade: If the plans do not provide for stabilizing, compact <br /> the subgrade in both cuts and fills to the density specified in 120-9.5. For undisturbed soils, do <br /> not apply density requirements where constructing narrow widening strips or paved shoulders <br /> 5 feet or less in width. <br /> Where trenches for widening strips are not of sufficient width to permit the use <br /> of standard compaction equipment, perform compaction using vibratory rollers, trench rollers, <br /> or other type compaction equipment approved by the Engineer. <br /> Maintain the required density until the base or pavement is placed on the <br /> subgrade. <br /> 01025-30 Technical Specifications <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\0845B-Old Dixie Hwy Sidewalk(38th Ln-45th St)\Admim\bid <br /> documents\Master Contract Documents\Technical Specifications.doc <br />