My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-000 (2)
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-000 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2018 12:54:31 PM
Creation date
3/23/2016 9:12:18 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
08/20/2013
Control Number
2013-000
Subject
Fertilizer and Landscape Management
Area
Old Dixie Highway Sidewalk 38th Lane to 45th Street
Alternate Name
Sidewalk Improvements
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000I\S0005EA.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
14586
Document Relationships
2013-014
(Agenda)
Path:
\Ordinances\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
120-8.2.3 Other Limited Areas: Compact in other limited areas using <br /> mechanical tampers or approved hand tampers, until the cover over the structure is at least <br /> 12 inches thick. When hand tampers are used, deposit the materials in layers not more than <br /> 4 inches thick using hand tampers suitable for this purpose with a face area of not more than <br /> 100 in2. Take special precautions to prevent any wedging action against the masonry, and <br /> step or terrace the slope bounding the excavation for abutments and wingwalls if required by <br /> the Engineer. <br /> 120-8.2.4 Culverts and Piers: Backfill around culverts and piers on both sides <br /> simultaneously to approximately the same elevation. <br /> 120-8.2.5 Compaction Under Wet Conditions: Where wet conditions do not <br /> permit the use of mechanical tampers, compact using hand tampers. Use only A-3 material <br /> for the hand tamped portions of the backfill. When the backfill has reached an elevation and <br /> condition such as to make the use of the mechanical tampers practical, perform mechanical <br /> tamping in such manner and to such extent as to transfer the compaction force into the <br /> sections previously tamped by hand. <br /> 120-8.3 Additional Requirements for Pipe 15 Inches Inside Diameter or Greater: <br /> 120-8.3.1 General: Trenches for pipe may have up to four zones that must be <br /> backfilled. <br /> Lowest Zone: The lowest zone is backfilled for deep undercuts up to <br /> within 4 inches of the bottom of the pipe. <br /> Bedding Zone: The zone above the Lowest Zone is the Bedding Zone. <br /> Usually it will be the backfill which is the 4 inches of soil below the bottom of the pipe. When <br /> rock or other hard material has been removed to place the pipe, the Bedding Zone will be the <br /> 12 inches of soil below the bottom of the pipe. <br /> Cover Zone: The next zone is backfill that is placed after the pipe has <br /> been laid and will be called the Cover Zone. This zone extends to 12 inches above the top of <br /> the pipe. The Cover Zone and the Bedding Zone are considered the Soil Envelope for the <br /> pipe. <br /> Top Zone: The Top Zone extends from 12 inches above the top of the <br /> pipe to the base or final grade. <br /> 120-8.3.2 Material: <br /> 120-8.3.2.1 Lowest Zone: Backfill areas undercut below the Bedding <br /> Zone of a pipe with coarse sand, or other suitable granular material, obtained from the <br /> grading operations on the project, or a commercial material if no suitable material is available. <br /> 120-8.3.2.2 Soil Envelope: In both the Bedding Zone and the Cover <br /> Zone of the pipe, backfill with materials classified as A-1, A-2, or A-3. Material classified as A- <br /> 4 may be used if the pipe is concrete pipe. <br /> 120-8.3.2.3 Top Zone: Backfill the area of the trench above the soil <br /> envelope of the pipe with materials allowed on Design Standard, Index No. 505. <br /> 120-8.3.3 Compaction: <br /> 120-8.3.3.1 Lowest Zone: Compact the soil in the Lowest Zone to <br /> approximately match the density of the soil in which the trench was cut. <br /> 01025-32 Technical Specifications <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\0845B-Old Dixie Hwy Sidewalk(38th Ln-45th St)Wdmim\bid <br /> documents\Master Contract Documents\Technical Specifications.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.