Laserfiche WebLink
120-12 Method of Measurement. <br /> 120-12.1 Excavation: Excavation will be paid for by volume, in cubic yards, calculated <br /> by the method of average end areas, unless the Engineer determines that another method of <br /> calculation will provide a more accurate result. The material will be measured in its original <br /> position by field survey or by photogrammetric means as designated by the Engineer. <br /> Measurement for payment will include the excavation of unsuitable material, lateral ditch <br /> excavation, channel excavation, and excavation for structures and pipe. Payment will not be <br /> made for excavation or embankment beyond the limits shown in the plans or authorized by <br /> the Engineer. <br /> 120-12.2 Embankment: Measurement will be made on a loose volume basis, as <br /> measured in trucks or other hauling equipment at the point of dumping on the road. Payment <br /> will not be made for embankment beyond the limits shown in the plans or authorized by the <br /> Engineer. <br /> 120-13 Basis of Payment. <br /> 120-13.1 General: Prices and payments for the work items included in this Section will <br /> be full compensation for all work described herein, including excavating, dredging, hauling, <br /> placing, and compacting; dressing the surface of the earthwork; and maintaining and <br /> protecting the complete earthwork. <br /> 120-13.2 Excavation: The total quantity of all excavation specified under this Section <br /> will be paid for at the Contract unit price for Excavation. No payment will be made for the <br /> excavation of any materials which are used for purposes other than those shown in the plans <br /> or designated by the Engineer. No payment will be made for materials excavated outside the <br /> lines and grades given by the Engineer, unless specifically authorized by the Engineer. <br /> 120-13.3 Embankment: The total quantity of embankment specified in this Section will <br /> be paid for at the Contract unit price for embankment. No payment will be made for materials <br /> which are used for purposes other than those shown in the plans or designated by the <br /> Engineer. No payment will be made for materials placed outside the lines and grades given by <br /> the Engineer. <br /> Item of Payment <br /> Payment for the work specified in this item shall be made under: <br /> Bid Item No. 120-1 — Regular Excavation — Per Cubic Yard <br /> Bid Item No. 120-6 — Embankment (Compacted in Place) — Per Cubic Yard <br /> SECTION 286 — TURNOUT CONSTRUCTION <br /> The work specified in this item shall conform to Section 286 of the Florida <br /> Department of Transportation Standard Specifications for Road and Bridge <br /> Construction (2013). <br /> Item of Payment <br /> Payment shall be made under: <br /> Bid Item No. 286-1— Turnouts and Drives (6" Thick Conc.) — Per Square Yard <br /> 01025-35 Technical Specifications <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\08458-Old Dixie Hwy Sidewalk(38th Ln-45th St)\Admim\bid <br /> documents\Master Contract Documents\Technical Specifications.doc <br />