My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-000 (2)
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-000 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2018 12:54:31 PM
Creation date
3/23/2016 9:12:18 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
08/20/2013
Control Number
2013-000
Subject
Fertilizer and Landscape Management
Area
Old Dixie Highway Sidewalk 38th Lane to 45th Street
Alternate Name
Sidewalk Improvements
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000I\S0005EA.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
14586
Document Relationships
2013-014
(Agenda)
Path:
\Ordinances\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
minimize segregation and meet the specification requirements when recovered from storage. <br /> Continuously and uniformly sprinkle coarse aggregate with water, for 24 hours preceding <br /> introduction into the concrete mix. Timers may be used to facilitate the sprinkling of aggregate <br /> stockpiles using an alternating on/off method. However, in no event shall the top surface of <br /> the stockpile be permitted to become dry prior to batching of concrete. Moisture probes may <br /> be used to determine the moisture content of the aggregate. Ensure that the accuracy of the <br /> probe is certified annually and verified weekly. Maintain stored aggregates in a well-drained <br /> condition to minimize free water content. Provide access for the Engineer to sample the <br /> aggregates from the recovery side of the storage facility. <br /> 344-3 Production, Mixing and Delivery of Concrete. <br /> 344-3.1 Concrete Production Requirements: Use concrete production facilities <br /> certified by the National Ready-Mixed Concrete Association (NRMCA), approved by the <br /> FDOT. <br /> Produce concrete utilizing equipment that is in good operating condition and <br /> operated in a manner to ensure a consistent product. When moisture probes are not used, <br /> ensure that the concrete production facility determines the free moisture for the coarse and <br /> fine aggregates within two hours prior to each day's batching. On concrete placements <br /> expected to exceed three hours, perform an additional moisture test approximately half way <br /> through the batching operations and adjust batch proportions accordingly. <br /> Ensure that the calibration of the measuring devices of the concrete production <br /> facilities meets the requirements of Chapter 531 of the Florida Statutes, and are in <br /> accordance with Chapter 9.2 of the FDOT Materials Manual. At least quarterly, ensure that all <br /> scales, meters and other weighing or measuring devices are checked for accuracy by a <br /> qualified representative of a scale company registered with the Bureau of Weights and <br /> Measures of the Florida Department of Agriculture. As an alternative, the producer may have <br /> this frequency identified in an FDOT approved QC plan. The accuracy of admixture <br /> measuring dispensers will be certified annually by the admixture supplier. <br /> When Volumetric Mixers are used for Category I applications, deliver concrete in <br /> accordance with the requirements of Volumetric Mixer Manufacturers Bureau (VMMB) and <br /> ensure that the vehicle has a VMMB registered rating plate. <br /> 344-3.2 Classes of Concrete: Classes of concrete to be used on the project will be <br /> defined in the Contract Documents. <br /> 344-3.3 Contractors Quality Control: The Contractor will supply a Quality Control <br /> (QC) plan to identity to the Agency how quality will be ensured at the project site. During <br /> random inspections the Agency will use this document to verify that the construction of the <br /> project is in agreement with his QC plan. <br /> 344-3.4 Concrete Mix Design: Before producing any concrete, submit the proposed <br /> mix design to the Engineer on a form provided by the Agency. Otherwise, the agency will <br /> accept mix designs previously described in an FDOT approved QC plan. In any event, use <br /> only concrete mix designs having prior approval of the Engineer. <br /> Materials may be adjusted provided that the theoretical yield requirement of the <br /> approved mix design is met. Show all required original approved design mix data and batch <br /> adjustments and substituted material on an Agency approved concrete delivery ticket. The <br /> Engineer may disqualify any concrete production facility for non-compliance with specification <br /> requirements. <br /> 01025-37 Technical Specifications <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\084513-Old Dixie Hwy Sidewalk(38th Ln-45th St)\Admim\bid <br /> documents\Master Contract Documents\Technical Specifications.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.