uniformly distributing the material at the specified rate. <br /> Contractor shall apply applications as per manufacturer's specification. All tickets from <br /> bags shall be handed over to the County Inspector. <br /> On steep slopes, where the use of a machine for spreading or mixing is not <br /> practicable, the fertilizer shall be spread by hand and raked in and thoroughly mixed <br /> with the soil to a depth of approximately 2 inches. <br /> H. Placing Sod: The sod shall be placed on the prepared surface, with edges in close <br /> contact and shall be firmly and smoothly embedded by light tamping with appropriate <br /> tools. <br /> Where sodding is used in drainage ditches, the setting of the pieces shall be staggered <br /> so as to avoid a continuous seam along the line of flow. Along the edges of such <br /> staggered areas, the offsets of individual strips shall not exceed 6 inches. In order to <br /> prevent erosion caused by vertical edges at the outer limits, the outer pieces of sod <br /> shall be tamped so as to produce a featheredge effect. <br /> Where sodding is placed abutting paved shoulder, the contractor is to ensure that the <br /> finished sod elevation is 1'/2" below paved shoulder. <br /> On slopes greater than 3:1, the Contractor shall prevent the sod from sliding by means <br /> of wooden pegs driven through the sod blocks into firm earth, at suitable intervals. <br /> Sodding shall not be performed when weather and soil conditions are, in the <br /> Engineer's opinion, unsuitable for proper results. <br /> Sod shall be placed around all structures, equipment pads, etc. <br /> I. Watering: The areas on which the sod is to be placed shall contain sufficient moisture, <br /> as determined by the Engineer, for optimum results. After being placed, the sod shall <br /> be kept in a moist condition to the full depth of the rooting zone for at least 2 weeks. <br /> Thereafter, the Contractor shall apply water as needed until the sod roots and starts to <br /> grow for a minimum of 60 days (or until final acceptance, whichever is latest). <br /> J. Maintenance: The Contractor shall, at his expense, maintain the sodded areas in a <br /> satisfactory condition until final acceptance of the project. Such maintenance shall <br /> include repairing of any damaged areas and replacing areas in which the establishment <br /> of the grass stand does not appear to be developing satisfactorily. <br /> Replanting or repair necessary due to the Contractor's negligence, carelessness or <br /> failure to provide routine maintenance shall be at the Contractor's expense. <br /> The Contractor shall maintain the sodded area up to the final acceptance date as <br /> directed by the Engineer. Grass height shall not exceed 6"without mowing. Clippings <br /> shall be removed from sidewalk. <br /> K. Article 570-9. The first two paragraphs under this Article are deleted and the <br /> following is added: <br /> The contract unit price for performance turf shall include the costs of sod, fertilizer (2 <br /> applications), sidewalk sweeping after mowing, mowing, pegging disposal of clippings, <br /> water, tools, equipment, labor and all other incidentals necessary. <br /> 01025-42 Technical Specifications <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\08456-Old Dixie Hwy Sidewalk(38th Ln-45th St)\Admim\bid <br /> documents\Master Contract Documents\Technical Specifications.doc <br />