My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/01/2014 (4)
CBCC
>
Meetings
>
2010's
>
2014
>
04/01/2014 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2021 1:17:25 PM
Creation date
3/23/2016 9:18:29 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/01/2014
Meeting Body
Board of County Commissioners
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000K\S0005ZY.tif
SmeadsoftID
14725
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
572
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY, FLORIDA <br /> MEMORANDUM <br /> TO: Jennifer Hyde,Purchasing Manager <br /> THROUGH: Christopher R. Mora,, P.E., Public Works Direct <br /> Christopher J. Kafer,Jr., P.E., County Enginee <br /> Michael D.Nixon, P.E., Roadway Production nager,�� <br /> FROM: Etienne B. Bourgeois, P.E.,Project Engineet�� <br /> SUBJECT: Bid No:2014028 <br /> Roseland Lake Clearing& Dredging <br /> IRC Project No. 1219 <br /> DATE: March 24,2014 <br /> The Roseland Lake clearing&Dredging project attracted only 2 contractors to submit bids.One <br /> contractor failed to provide all documents required for an acceptable bid, resulting in <br /> disqualification.The second contractor's bid is 809/6 higherthan the construction budget for the <br /> project. Staff believes contractors may have been discouraged from bidding the project for a <br /> Lump Sum fee due to the risk involved with estimated quantities. <br /> Staff recommends rejecting all bids and reissuing the project for bidding at a later date. <br /> Following rejection of the bids for the Roseland Lake Clearing and Dredging,staff recommends <br /> approval to obtain additional topographic survey data and geotechnical information to revise <br /> the construction plans and specifications.The revised plans and specifications will allow for a <br /> unit price based construction contract.Staff expects bidding of a unit price contract to result in <br /> additional responses and more competitive prices since the contractors have increased <br /> protection from costly unforeseen circumstances during construction. <br /> P'Tublic Works\ENGINEERING DIVISION PROJECTSU 219-Roseland Lake improvementMdmunlcorrespondence\2014028 Reject Bids Memo.doc <br /> 102 <br />
The URL can be used to link to this page
Your browser does not support the video tag.