Laserfiche WebLink
ATTACHMENT 1 provides a complete breakdown of all technical revisions made to the Utility <br /> Construction Standards on a drawing by drawing and section by section basis. The intent and technical <br /> integrity of the document remains intact, and all revisions are considered to be clarifications. The revised <br /> standards will be incorporated into the Indian River County Website, (www.ircutilities.com) and are available <br /> for downloading in a PDF format. Navigate to the Utility Department and follow the link to Water and <br /> Wastewater Standards. <br /> TECHNICAL MODIFICATIONS TO <br /> WATER, WASTEWATER & RECLAIMED WATER <br /> CONSTRUCTION STANDARDS — FEBRUARY 2014 <br /> 11. DETAIL DRAWINGS <br /> W-1—FIRE HYDRANT AND VALVES(LOCATION DETAIL),add to Notes 6.BRINE—BROWN <br /> W-2—FIRE HYDRANT NOTES,revise Notes 9. Maintain 6' radius... to Maintain 7'-6"radius... <br /> W-3—MANUAL 2"BLOW OFF,revise drawing,removed 2"corporation stop and meter,2"radio read <br /> W-4—WATER SERVICE, revise drawing, included pre-plumbed water meter <br /> W-5—Revise Number from W-4A to W-5-WATER SERVICE (OUTSIDE OF RIGHT OF WAY), revise drawing, <br /> included pre-plumbed water meter <br /> W-6 — Revise Number from W-5 to W-6-METER BOX, revise drawing, included pre-plumbed water <br /> meter <br /> W-7—TYPICAL PRE-PLUMBER METER BOX,New drawing that depicts pre-plumbed water meter <br /> W-8-Revise Number from W-6 to W-8-TEMPORARY SAMPLING POINT <br /> W-9-Revise Number from W-7 to W-9-FLUSHING CONNECTION <br /> W-10 - Revise Number from W-8 to W-10-DOUBLE-DETECTOR CHECK VALVE ASSEMBLY, add gate <br /> valve between water main and check valve. <br /> W-11 -Revise Number from W-9 to W-11-BACKFLOW PREVENTER <br /> W-12 - Revise Number from W-10 to W-12-MASTER METER COMBINATION ASSEMBLY, revised note <br /> 2 and add note 6,add gate valve to drawing,add commercial grade fiber mesh concrete note <br /> W-8-Revise Number from W-12 to W-13-TEMPORARY JUMPER DETAIL,add note 5. <br /> W-8-Revise Number from W-12A to W-14-TEMPORARY JUMPER DETAIL NOTES <br /> R-1 - Revise Number from W-11 to R-1 — REUSE METER/VALVE (ASSEMBLY DETAIL.), add commercial <br /> grade fiber mesh concrete note <br /> R-2-Revise Number from W-1 IA to R-2—REUSE PIPE(DISCHARGE DETAIL) <br /> S-1 -Revise Note 5—See S-2A to read S-3 <br /> F:\Utilities\UTILITY—CONSTRUCTION STANDARDS\Revision 2014\Agenda Item March 2014 <br /> 119 <br />