My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/01/2014 (4)
CBCC
>
Meetings
>
2010's
>
2014
>
04/01/2014 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2021 1:17:25 PM
Creation date
3/23/2016 9:18:29 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/01/2014
Meeting Body
Board of County Commissioners
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000K\S0005ZY.tif
SmeadsoftID
14725
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
572
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
O O <br /> FLOW ° ° FLOW <br /> WATER MAIN <br /> REDUCED PRESSURE PLAN VIEW <br /> BACKFLOW PREVENTER <br /> WITH GATE VALVES <br /> 0 o WATER MAIN <br /> UNION <br /> X <br /> Z <br /> _ a <br /> FINISHED <br /> iv oo GRADE <br /> FLOW FLOW <br /> ELEVATION <br /> -ART- <br /> NOTES <br /> 1. ALL BUILDINGS WITH FIRE SPRINKLER PROTECTION SYSTEMS INCLUDING SINGLE FAMILY RESDENIIAL <br /> AND COMMERCIAL ARE REQUIRED TO INSTALL DOUBLE CHECK BACKFLOW PREVENTER <br /> WITH REDUCED PRESSURE ZONE FEATURE AS DETERMINED BY UTILITY. <br /> 2. ALL MULTI—STORY, MULTI—FAMILY SERVICES ARE REQUIRED TO INSTALL <br /> RPZ BACKFLOW PREVENTORS. <br /> 3. APPROVED EQUALS HAVING FULL UL, USC, AND AWWA CERTIFICATIONS MAY <br /> BE INSTALLED ONLY AFTER SPECIFIC APPROVAL BY IRCDUS. <br /> 4. SUPPORT BACKFLOW PREVENTER FROM WALL OR APPROVED PIPE <br /> SUPPORT SYSTEM. PIPE SUPPORT SYSTEM SHALL BE BRASS, <br /> COPPER OR D.I.P., AS APPROVED BY IRCDUS. <br /> 5. BELOW GROUND INSTALLATION IN A VAULT MAY BE CONSIDERED <br /> FOR APPROVAL IF FINISHED GRADE OF BOTTOM OF VAULT IS AT <br /> LEAST 1'-0" ABOVE THE HIGH WATER LEVEL. <br /> 6. PIPING 2-1/2" OR GREATER SHALL BE FLANGED DUCTILE IRON PIPE. <br /> 7. ALL MATERIALS ARE TO BE PER IRCDUS APPROVED MANUFACTURERS' PRODUCT LIST. <br /> 8. ALL FASTENERS SHALL BE 304 STAINLESS STEEL (OR APPROVED EQUAL). <br /> 9. ALL RPZ BACK FLOW PREVENTERS SHALL BE CERTIFIED BY APPROVED TESTER AND APPROPRIATE <br /> CERTIFIED FORM SUBMITTED TO IRCDUS. <br /> gIvER DRAWING <br /> INDIAN RIVER COUNTY NO. <br /> �'oG NO. <br /> DEPARTMENT OF y BACKFLOW PREVENTER <br /> UTILITIES SERVICES W-11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.