My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/01/2014 (4)
CBCC
>
Meetings
>
2010's
>
2014
>
04/01/2014 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2021 1:17:25 PM
Creation date
3/23/2016 9:18:29 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/01/2014
Meeting Body
Board of County Commissioners
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000K\S0005ZY.tif
SmeadsoftID
14725
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
572
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. A 304 stainless steel back-up ring shall mate with a 304 <br /> stainless steel flange. <br /> 3. Ductile iron back-up rings shall mate with cast iron flanges. <br /> M. Flange connections shall be provided with a full-face neoprene <br /> gasket. <br /> N. All PE pipe must be at the temperature of the surrounding soil at <br /> the time of backfilling and compaction. <br /> O. No single piece of pipe shall be laid unless it is straight. The <br /> centerline of the pipe shall not deviate from a straight line drawn <br /> between the centers of the openings at the ends of the pipe by <br /> more than 1/16-in per foot of length. If a piece of pipe fails to <br /> meet this requirement check for straightness, it shall be rejected <br /> and removed from the site. Laying instructions of the <br /> manufacturer shall be explicitly followed. <br /> P. If a defective pipe is discovered after it has been installed, it shall <br /> be removed and replaced with a sound pipe in a satisfactory <br /> manner. All pipe and fittings shall be thoroughly cleaned before <br /> installation, shall be kept clean until they are used in the work and <br /> when laid, shall conform to the lines and grades required. <br /> Q. As soon as the excavation is complete to normal grade of the <br /> bottom of the trench, bedding shall be placed, compacted and <br /> graded to provide firm, uniform and continuous support for the <br /> pipe. Bell holes shall be excavated so that only the barrel of the <br /> pipe bears upon the bedding. The pipe shall be laid accurately to <br /> the lines and grades indicated on the Drawings. Blocking under <br /> the pipe will not be permitted. Bedding shall be placed evenly on <br /> each side of the pipe to mid-diameter and hand tools shall be <br /> used to force the bedding under the haunches of the pipe and into <br /> the bell holes to give firm continuous support for the pipe. <br /> Bedding shall then be placed to 12-in above the top of the pipe. <br /> The initial 3-ft of backfill above the bedding shall be placed in 1-ft <br /> layers and carefully compacted. Generally the compaction shall <br /> be done evenly on each side of the pipe and compaction <br /> equipment shall not be operated directly over the pipe until <br /> sufficient backfill has been placed to ensure that such compaction <br /> equipment will not have a damaging effect on the pipe. The pipe <br /> manufacturer's representative prior to use shall approve <br /> equipment used in compacting the initial 3-ft of backfill. <br /> R. Good alignment shall be preserved during installation. The <br /> deflection at joints shall not exceed that recommended by <br /> manufacturer. Fittings, in addition to those shown on the <br /> Drawings, shall be provided, if required, in crossing of utilities that <br /> may be encountered upon opening the trench. <br /> 3 - 8 <br /> Ia3 . �. 8. <br />
The URL can be used to link to this page
Your browser does not support the video tag.