discharging liquid clay to facilitate the installation of the pipe <br /> into a stabilized and lubricated tunnel. <br /> 8. A minimum of two (2) insulated #6 stranded tracer wire shall <br /> be installed along with the PE pipe. The tracer wire shall be <br /> tested for continuity upon completed installation. Should both <br /> tracer wires fail to test for continuity then the test shall be <br /> considered a failure and the wires shall be replaced. Tracing <br /> wires, #10 stranded conductor copper, shall be wrapped or <br /> affixed to the top of the pipe and fittings. <br /> 9. Upon completion of boring and pipe installation, the Contractor <br /> shall remove all spoils from the starting and termination pits. <br /> All pits shall be restored to their original condition. <br /> 10.The shoulders, ditches, banks, and slopes of roads and <br /> railroads crossed and paralleled shall not wash out before <br /> becoming consolidated. Restoration shall be as required by <br /> the jurisdictional authority and as specified within the Contract <br /> Document. <br /> END OF SECTION <br /> 3 - 12 <br />