My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/01/2014 (4)
CBCC
>
Meetings
>
2010's
>
2014
>
04/01/2014 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2021 1:17:25 PM
Creation date
3/23/2016 9:18:29 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/01/2014
Meeting Body
Board of County Commissioners
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000K\S0005ZY.tif
SmeadsoftID
14725
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
572
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10.05 TOOLS AND SPARE PARTS <br /> A. Any special tools required shall be provided. <br /> B. The manufacturer shall furnish a complete set of recommended <br /> spare parts necessary for the first three (3) years of operation of <br /> the pumping system, which shall include at least the following: <br /> 1. 1 —set of upper bearings <br /> 2. 1 —set of lower bearings <br /> 3. 1 —set of upper and lower shaft seals <br /> 4. 1 —relay and phase monitor for each type supplied with the <br /> pump control panel for each station <br /> 5. Gringer Pump Station (2 Complete Sets) Impeller and <br /> Bottom Plate is one set. <br /> 6. Solid Handling Pumps (1 Impeller) <br /> 7. 1 —TC0001 Programmed to the corresponding Frequency <br /> C. Spare parts shall be properly bound and labeled for easy <br /> identification without opening the packaging, and suitably <br /> protected for long-term storage. <br /> 10.06 WARRANTY <br /> A. The Contractor and the equipment manufacturers shall warrant all <br /> equipment supplied under this section for a period of five (5) year. <br /> Warranty period shall commence on final date when the IRCDUS <br /> accepts the project. <br /> B. The equipment shall be warranted to be free from defects in <br /> workmanship, design and materials. If any part of the equipment <br /> should fail during the warranty period, it shall be replaced in the <br /> machine(s) and the unit(s) restored to service at no expense to <br /> the IRCDUS. <br /> C. The manufacturer's warranty period shall run concurrently with the <br /> Contractor's warranty period. No exception to the provision shall <br /> be allowed. <br /> 10.07 MATERIALS AND EQUIPMENT <br /> A. The pumping units required under this section shall be complete, <br /> including pumps and motors with proper alignment and balancing <br /> of the individual units. All parts shall be so designed and <br /> proportioned as to have liberal strength, stability, and stiffness, <br /> and to be especially adapted for the work to be done. Ample <br /> room shall be provided for inspection, repairs, and adjustments. <br /> B. Each foundation plate for each pump shall be rigidly and <br /> accurately anchored into position. The same pump manufacturer <br /> 10 - 3 <br /> 1 -;L-6.K.�1. <br />
The URL can be used to link to this page
Your browser does not support the video tag.