My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/01/2014 (4)
CBCC
>
Meetings
>
2010's
>
2014
>
04/01/2014 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2021 1:17:25 PM
Creation date
3/23/2016 9:18:29 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/01/2014
Meeting Body
Board of County Commissioners
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000K\S0005ZY.tif
SmeadsoftID
14725
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
572
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
County ("The Code"); and providing for severability, <br />codification, and an effective date. <br />10.B. PUBLICDISCUSSIONITEMS <br />IO.B.1. REQUEST TO SPEAK FROM HARLAN FRANKLIN AND ALEX JERNIGAN <br />REGARDING WATER LINE EXTENSION — NORTH INDIAN RIVER DRIVE <br />TO ROSELAND ROAD <br />Harlan Franklin, 13680 North Indian River Drive, Sebastian, requested the Board assist <br />the residents of North Indian River Drive in obtaining County water since there is County water <br />service one block north and two blocks south of his neighborhood. <br />Director of Utility Services Vincent Burke responded to the Commissioners' questions by <br />displaying an aerial map to identify the areas that have water service connections; where the <br />waterlines currently stop; and how staff has looked at the situation in an attempt to resolve the <br />issue. <br />A lengthy discussion ensued regarding looping the water service for better water quality <br />and better redundancy in the system, and staff's two scenarios relating to water assessment. <br />MOTION WAS MADE by Vice Chairman Davis, <br />SECONDED by Commissioner Flescher, to direct staff to: <br />(1) obtain a detailed survey and engineering work to <br />develop a firm cost for Scenario 1 (Indian River Drive — <br />19 parcels) and Scenario 2 (Indian River Drive with 17 <br />parcels); (2) present the cost information to the property <br />owners; and (3) bring the information back to the Board. <br />April 1, 2014 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.