Laserfiche WebLink
L. Upon completion of the work, the sewer system or selected sections <br /> therein shall be subjected to a final test and inspection. All work in the <br /> system or sections therein being tested shall be complete, cleaned and <br /> ready for use. Tests shall be as specified herein and shall meet all <br /> requirements as to line, grade, clean lines, infiltration, exfiltration and <br /> workmanship. <br /> M. Inspection of mains shall be by use of a self-contained television system <br /> and lamping upon satisfactory completion and acceptance of final road <br /> base material. The facilities shall be provided and operated by the <br /> Contractor as specified below: <br /> The Contractor shall provide the IRCDUS with an electronic <br /> record, on CD format, of the interior of all main line gravity sewers <br /> and the interior of all sewer laterals. The CD shall be contained in <br /> a proper container to prevent damage to the CD. The electronic <br /> recording (video) shall be obtained by pulling a television camera <br /> through the line along the axis of the pipe. The television <br /> equipment shall consist of a self-contained camera and a <br /> monitoring unit connected by a coaxial cable. These videos shall <br /> be done during the inspection of the mains. Monitors shall be <br /> available to the Engineer and Owner during these inspections. <br /> Monitors shall also be provided with a stop action camera, so that <br /> as may be requested by the Engineer, photographs shall be made <br /> of a particular portion of the main being viewed. The video shall <br /> be properly exposed and the camera shall be in proper focus so <br /> that good, clear recordings showing detail are produced. The <br /> visual recordings shall be identified by audio recordings noting the <br /> manhole numbers, distances to service lateral connections, <br /> direction of lateral connection and any leaks, cracks or pipe <br /> defects. Each CD shall be clearly marked as to the contents and <br /> number, with an index of all CD's. The CD's of the completed <br /> mains shall be delivered to IRCDUS. The Contractor shall provide <br /> any assistance required by the IRCDUS or the Engineer of <br /> Record. <br /> N. A maximum tolerance of Y2" dip will be accepted in gravity sewer <br /> construction. <br /> END OF SECTION <br /> 13 - 6 <br /> l � 3. nJ- 7 <br />