My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/01/2014 (4)
CBCC
>
Meetings
>
2010's
>
2014
>
04/01/2014 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2021 1:17:25 PM
Creation date
3/23/2016 9:18:29 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/01/2014
Meeting Body
Board of County Commissioners
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000K\S0005ZY.tif
SmeadsoftID
14725
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
572
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE SCOPE OF THE ENGINEERING REPORT SHALL BE DEPENDENT ON THE <br /> COMPLEXITY OT THE PROPOSED PROJECT FOLLOWING CUSTOMARY <br /> ENGINEERING STANDARDS. GUIDELINES WILL BE MADE AVAILABLE AT THE <br /> INDIAN RIVER COUNTY DEPARTMENT OF UTILITY SERVICE <br /> (INITIAL) <br /> D. METHOD (S) OF FLOW DERIVATION (CHECK APPROPRIATE LINES <br /> ( ) EQUIVALENT RESIDENTIAL UNIT DETERMINATION TABLE <br /> ( ) SPECIFIC REQUIREMENTS FOR INDUSTRIAL USE <br /> ( ) EXISTING FACILITY/PREVIOUS RECORDS <br /> 1. ERU DETERMINATION TABLE (COPY ATTACHED): <br /> TYPE OF ESTABLISHMENT <br /> SQUARE FEET <br /> APPLICABLE UNITS <br /> WATER: <br /> PROJECTED FLOW (ERUS)x 250 GALLONS/DAY= GPD(ADF) <br /> WASTEWATER: <br /> PROJECTED FLOW (ERUS)x 250 GALLONS/ DAY= GPD (ADF) <br /> 2. SPECIFIC INDUSTRIAL USE: <br /> TYPE (S) OF USE <br /> WATER: <br /> PROJECT FLOW <br /> WASTEWATER: <br /> PROJECT FLOW <br /> 3. EXISTING FACILITY/PREVIOUS RECORDS: <br /> THE INDIAN RIVER COUNTY UTILITIES DEPARTMENT MAY CONSIDER THE PAST <br /> RECORDS OF AN EXISTING OPERATIONAL FACILITY FOR DETERMINING PROPOSED <br /> FLOW REQUIREMENTS FOR A NEW DEVELOPMENT, PROVIDED THE APPLICANT <br /> SUBMITS SUFFICIENT INFORMATION TO ALLOW THE DEPARTMENT TO DETERMINE <br /> ANTICIPATED FLOW. THIS INFORMATION SHALL INCLUDE, BUT NOT BE LIMITED TO, <br /> TWENTY-FOUR MONTHS OF PREVIOUS WATER BILLS AND A COMPLETE LISTING OF <br /> THE DIFFERENCES IN THE EXISTING AND PROPOSED FACILITY SUCH AS SIZE, HOURS <br /> OF OPERATION, TYPE OF USES, NUMBER OF EMPLOYEES, ETC. <br /> E. GENERAL: <br /> ADDITIONAL WATER FLOW ANTICIPATED FOR PROJECT PHASING, BUT NOT <br /> REQUESTED <br /> (ESTIMATED) <br /> PAGE 2 <br /> I a 3. -r. 3. <br />
The URL can be used to link to this page
Your browser does not support the video tag.