My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/01/2014 (4)
CBCC
>
Meetings
>
2010's
>
2014
>
04/01/2014 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2021 1:17:25 PM
Creation date
3/23/2016 9:18:29 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/01/2014
Meeting Body
Board of County Commissioners
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000K\S0005ZY.tif
SmeadsoftID
14725
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
572
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />BRIDGE DESIGN ASSOCIATES, INC. OEXHIBIT A <br />20TH AVENUE & 16TH STREET INTERSECTION IMPROVEMENTS <br />March 3, 2014 <br />HOURLY BREAKDOWN OF SERVICES <br />EXHIBIT "A <br />ACTIVITY <br />PROJECT <br />MANAGER <br />PROJECT <br />ENGINEER <br />FIELD REP <br />EJ. <br />CAD <br />TECHNICIAN <br />TOTAL <br />HOURS <br />By <br />ACTIVITY <br />LABOR <br />COST <br />BY <br />ACTIVITY <br />$150.W <br />$115.00 <br />$70.00 <br />390.80 <br />CODrdlnation Meetings <br />3.0 <br />3.0 <br />$450.00 <br />Site Visit <br />3.0 <br />9:0 <br />810 <br />5555.00 <br />6X6 BOX CULVERT AT STATION 16+48 <br />Foundation Desig <br />1.0 <br />1 <br />7.0 <br />$840.00 <br />Wall Des n:& Headwall <br />1.0 <br />2,0 <br />6.0 <br />_.. <br />0.0 <br />$800.00 <br />Top Desi n <br />1.0 <br />2.0 <br />BA <br />e.0 <br />$800.00 <br />Plan / Elevation / Details, <br />1.0 <br />4,0 <br />24.0 <br />20.0 <br />$2.770.00 <br />MISCellaneou5 Connedon DetaO <br />2.0 <br />4.0 <br />8.0 <br />$510.00 <br />6Xe HAX CULVERT AT STATION 24+0 . <br />Foundation Design <br />1,0 <br />0.0 <br />7.0 <br />$e4o.00 <br />Wall Demian & Headwall <br />1.0 <br />2.0 . <br />6.0 <br />0.0 <br />SB00.00 <br />Top Design <br />1.0 <br />2.0 <br />6.0 <br />0.0 <br />5800.00 <br />Plan / Elevallon l Details <br />1.0 <br />4.0 <br />24.0 <br />20.0 <br />$2.770.00 <br />.Miscellaneous connedon.detail <br />2.0 <br />4.0 <br />11,0 <br />$510.00. <br />TOTAL MANHOURS <br />11.0 <br />35.0 <br />35.0 <br />48.0 <br />120.0 <br />DIRECT LABOR COST <br />$1,850.00 <br />$4,025.00 <br />$$450.00 <br />$4.320.00 <br />$12.445.00 <br />6-V01.4-Jobs'Propoaala1201h Averaw and 18th Straai101 Admin%ProposalsWxtftR A 03-0114 <br />$12,495.00 <br />52 <br />
The URL can be used to link to this page
Your browser does not support the video tag.