My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-197A
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-197A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2018 3:55:08 PM
Creation date
3/23/2016 8:39:21 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Plan
Approved Date
10/01/2013
Control Number
2013-197A
Agenda Item Number
8.H.
Entity Name
Metropolitan Planning Organization
Subject
Transit Development Plan
GoLine Transit
Supplemental fields
FilePath
H:\Indian River\Network Files\SL000009\S0002YB.tif
Meeting Body
No data from migration
Meeting Type
NA
SmeadsoftID
12337
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Source: National Transit Database 2006-2010 <br />Figure 3-6 Total Vehicles Figure 3-7 VOMS <br />Spare ratio measures the difference between the number of vehicles available and the number <br />of vehicles operated in maximum service, divided by the number of vehicles in maximum <br />service. Low spare ratios may indicate potential issues in terms of the ability to schedule <br />preventative maintenance and a lack of vehicle capacity to respond to increased demand for <br />service, while high spare ratios may indicate an inefficient use of capital. Based on 2010 <br />NTD data, the average spare ratio for agencies with between 10 and 30 vehicles was 43 <br />percent. The median of GoLine's peer group was higher (approximately 75 percent). In <br />2010, GoLine's 50 percent spare ratio was within an acceptable range. <br />3-11 <br />Stanley Consultants a <br />
The URL can be used to link to this page
Your browser does not support the video tag.