My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/22/2013 (2)
CBCC
>
Meetings
>
2010's
>
2013
>
01/22/2013 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 10:46:16 AM
Creation date
3/23/2016 8:55:14 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
01/22/2013
Meeting Body
Board of County Commissioners
Book and Page
159
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000E\S0004MV.tif
SmeadsoftID
14201
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLIENT: Indian River County <br /> 'OJECT: Intersection of State Road 60(20th Street)and 43rd Avenue,Vero Beach,Florida <br /> ;CRIPTION: Preliminary Contamination Assessment <br /> TOTAL PROJECT COST: $60,748.50 <br /> NUMBER COST PER NUMBE COST PER <br /> ITEM DESCRIPTION UNITS UNITS UNIT EXTENSION ITEM DESCRIPTION UNITS UNITS UNIT EXTENSION <br /> PERSONNEL GENERAL FIELD EQUIPMENT AND EXPENDABLES <br /> Principal Engineer Per Hour $165.00 Data Logger <br /> 99 Per Day $390.00 <br /> Senior Project Manager Per Hour 4 $135.00 $540.00 Organic Vapor Analyzer(FID or PID) Per Day 7 $164.00 $1,148.00 <br /> Project Manager Per Hour $135.00 Generator Per Day 1 $95.00 $95.06 <br /> Senior Project Engineer/Geologist Per Hour 80 $115.00 $9,200.00 Pressure Washer Per Day $190.00 <br /> Project Engineer/Geologist III Per Hour $95.00 Surveying Equipment(Water Table Elevs) Per Day $78.00 <br /> Project Engineer/Geologist I Per Hour1 $95.00 Centrifugal Development Pump Per Day $61.00 <br /> Assistant Project Engineer/Geologist Per Hour $85.00 Submersible Development Pump Per Day $250.00 <br /> Senior Field Technician IV Per Hour 80 $52.00 $4,160.00 Peristaltic Purging Pump Per Day 7 $40.00 $280.00 <br /> Field Technician III Per Hour 40 $52.00 $2,080.001 Magnetometer Per Day $62.00 <br /> Field Technician II Per-Hour $44.00 Water Level IndicatorPer Day 7 $20.00 $140.00 <br /> Senior Technical Draftsman Per Hour 12 $52.00 $624.00 Product/Water Interface Probe Per Day $82.00 <br /> Technical Draftsman Per Hour $44.00 pH/conductivity Meter Per Day 7 $25.00 $175.00 <br /> Technical Secretary Per Hour 6 $42.00 $252.00 Turbidity Meter Per Day 7 $55.00 $385.00 <br /> Subtotal: $16,856.00 Dissolved Oxygen Meter Per Day. 7 $105.00 $735.00 <br /> Bailer Usage(Stainless Steel or Teflon-Per Each) Per Day $28.00 <br /> DRILLING Concrete Saw <br /> Per Day $140.00 <br /> MOBILIZATION/DEMOBILIZATION Concrete Coring Machine Per Day 2 $125.00 $250.00 <br /> Men and Equipment(lump sum) Per Mob. 1 $250.00 $250.001 EnCore Soil Sampler(5 gram) Each $25.00 <br /> Lump Sum Men and Equipment Mob. Per Mob. $500.00 Disposable Teflon Bailer Each $27.00 <br /> Mileage-Rig Per Mile $1.10 Disposable Polyethylene Bailer Each $17.00 <br /> Mileage-Truck Per Mile $0.60 High Capacity(1.0 micron)Filter Each $29.00 <br /> Mileage-Automobile Per Mile $0.44 16 oz.Soil Jars(soil gas analysis) Per Box 20 $10.00 $200.0 <br /> AUGER BORINGS Tygon Tubing Per Foot 20 $2.50 $50.00 <br /> Hand Auger Borings(Two-Man Crew) Per Hour 70 1 $145.00 $10,150.00 Polyethylene Tubing Per Foot 450 $0.60 $270.00 <br /> Auger Borings(4-inch) Per LF $10.25 Isopropyl Alcohol(decontamination) Per Gal. $19.00 <br /> SPT BORINGS(ASTM D-1586)in Soil(N-values<50): Deionized Water(decontamination) Per 5 Gal.1 $14.00 <br /> from surface to 25 feet Per LF $15.00 55-gallon Drum Each 20 $65.00 $1,300.0 <br /> from 25 feet to 50 feet Per LF $16.75 Visqueen(100 Feet by 20 Feet) Per Roll $720.00 <br /> tom 50 feet to 100 feet Per LF $18.75 Well or Piezometer Materials Estimated Per Well 26 $100.00 $2,600.0 <br /> 1 100 feet to 125 feet Per LF $23.75 Miscellaneous Equip.&Expend.,Estimated EUMP Su 4 $50.00 $200.00 <br /> n 125 feet to 150 feet Per LF $31.50 Subtotal: $7,828.00 <br /> ADDITIONAL SAMPLES FOR CONTINUOUS SPT SAMPLING: COMPACTION AND CLASSIFICATION TESTS <br /> from 10 feet to 25 feet Per Sample $29.00 Proctor,Standard or Modified Per Test 1 $102.00 <br /> from 25 feet to 50 feet Per Sample $32.00 Moisture Content(ASTM D-2216) Per Test $13.00 <br /> from 50 feet to 100 feet Per Sample $36.00 Sieve Analysis(ASTM D-421,D-422) Per Test $45.50 <br /> from 100 feet to 125 feet Per Sample $41.00 Percent Fines(ASTM D-1140) Per Test $30.50 <br /> from 125 feet to 150 feet Per Sample $51.00 Subtotal: $0.00 <br /> ASH BORINGS AND UNDISTURBED SOIL SAMPLING <br /> 3"Wash Borings in Sol-Cuttings Only Per LF $7.50 LABORATORY ANALYSIS AND OTHER SUBCONTRACTED SERVICES <br /> Shelby Tube Per Sample $130.00 EPA 602/8021 VOA's Only-water Per Test $69.00 <br /> Fixed-Piston Shelby,Osterberg,Pitcher Per Sample $158.00 EPA 602/8021 VOA's Only-soil Per Test 6 $97.75 $586.50 <br /> FURNISH,INSTALL,and REMOVE CASING(up to 4-inch) EPA 8260B VOA's&VOH's-water Per Test 26 $126.50 $3,289.00 <br /> from surface to 50 feet Per LF $9.00tPA 8260B VOA's&VOH's-sol Per Test 6 $161.00 $966.00 <br /> from 50 feet to 100 feetPer LF $1125 EPA 601/8021 VOH's Only-water Per Test $8625 <br /> from 100 feet to 150 feet Per LF $14.00 EPA 601/8021 VOH's Only-soil Per Test $109.25 <br /> MONITORING WELL INSTALLATION EPA 624/8260 Volatiles-water Per Test $149.50 <br /> Temporary 2"PVC Well(Piezometer) Per Foot 260 $18.00 $4,680.00 EPA 624/8260 Volatiles-soil Per Test $161.00 <br /> 2-inch PVC Per Foot $29.00 EPA81 GO PAH's-water or soil Per Test $126.50 <br /> 44nch PVC Per Foot $40.00 EPA 8270 PAH's-water Per Test 26 $126.50 $3,289.00 <br /> Double-Cased PVC Well(2"/6") Per Foot $50.00 EPA 8270 PAH's-soil Per Test 12 $138.00 $1,656.00 <br /> 8"Circular Well Manhole w/Pad Per Each $275.00 EPA 625/8270 Semi-Vors-water or soil Per Test $287.50 <br /> 12"Circular Well Manhole w/Pad Per Each $300.00 TPH by FL-PRO-water or soil Per Test 38 $115.00 $4,370.00 <br /> Above Ground Riser w/Pad Per Each $300.00 EPA 504 EDB-water or soil Per Test $57.50 <br /> DRILLING ON TIME BASIS Table B,FAC 62-770 water Per Test $402.50 <br /> Drilling-2 man-crew Per Hour $170.00 Table B,FAC 62-770 soil ---Per Test $276.00 <br /> Dulling-3 man-crew Per Hour $205.00 Table C,FAC 62-770 water Per Test $667.00 <br /> OTHER RELATED DRILLING CHARGES Table C,FAC 62-770 sol Per Test $667.00 <br /> Hole Location&Set-Up Per Hour $169.00 Virgin Pre-Bum(petroleum) Per Test $230.00 <br /> Decontamination of Equipment Per Hour 4 $170.00 $680.00 Non-Virgin Pre-Bum(petroleum) Per Test $287.50 <br /> Drumming Contaminated Soil(w/o Disp) Per Drum 20 1 $150.00 $3,000.001 EPA 608/8081 Cl pestJPCB's Per Test $10925 <br /> Drum Disposal(non hazardous) Per Drum 20 $155.00 $3,100.001 EPA 6010 Metals except Hg(each) Per Test $11.50 <br /> Standby Time Per Hour $169.00 RCRA Metals by EPA 6010 Per Test $10925 <br /> Bore Hole Grouting and Sealing(plus material Per Hour $185.00 TCLP/SPLP Extraction by EPA 1311/1312 Per Test $4025 <br /> Lodging and Subsistence Per Crewman Per Day $108.00 EPA TO-14-air Per Test $172.50 <br /> All Terrain Vehicle Add'VLF $1.00 EPA 18-air Per Test $115.00 <br /> "Tell Permits Per Each $100.00 Lab Waste Disposal Fee Lump Su 4 $12.00 $48.00 <br /> Subtotal: $21,860.00 Subtotal: $14,204.5 <br /> 12-3836 PCA Cost Estimate.xlsx Page 1 of 1 Printed 11/29/2012 at 2:26 PM 36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.