My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/22/2013 (2)
CBCC
>
Meetings
>
2010's
>
2013
>
01/22/2013 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 10:46:16 AM
Creation date
3/23/2016 8:55:14 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
01/22/2013
Meeting Body
Board of County Commissioners
Book and Page
159
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000E\S0004MV.tif
SmeadsoftID
14201
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�-� Kilt>lt3y Fdruaq <br /> e 2 of 15 <br /> � atld ASSOCIatB3,ltlt., <br /> + Vertical delineation of arsenic in ground water is required at monitoring <br /> well NEG MW-1. A minimum of l0 to 15 feet of separation is required <br /> between NEG MW-i and the corresponding deep well. <br /> • Resample the existing (and proposed deep) monitoring wells at the <br /> Northeast Grove. <br /> Southwest Grove <br /> • Additional ground water delineation for arsenic is warranted north of <br /> SWG MW-5 and east of SWG MW-6. <br /> • Vertical delineation of arsenic in ground water required at monitoring <br /> well SWG SHW-I. <br /> • The flow direction of the canal immediately west of the grove needs to be <br /> determined. Once established, the FDEP requested that upstream, <br /> midstream and downstream surface water samples be collected from the <br /> canal. <br /> • In-situ permeability testing (slug tests) should be performed in the <br /> Southwest Grove to establish the localized hydraulic conductivity for the <br /> surficial aquifer. <br /> The FDEP requested that a work plan be prepared and submitted for the foregoing <br /> assessment activities. The FDEP approved a time extension until March 23, 2012 <br /> to submit the results of the additional site activities. However, based on the <br /> February meeting it was acknowledged that the additional site activities would not <br /> be completed by this date; thus, submittal of the Work Plan should occur on or <br /> before this date. Additionally, the Department recommended that the work plan <br /> include a schedule for the completion of the field activities and the submittal of <br /> the corresponding report. <br /> Scope of Services <br /> KHA has prepared the following scope of services based on the foregoing project <br /> understanding. The scope of services has been developed to address the FDEP's <br /> comments in their July 14;2011 letter and the additional assessment activities <br /> discussed during the February 13,2012 meeting. <br /> Task 1—Work Plan Preparation <br /> KHA will prepare and submit a work plan for the completion of the additional site <br /> assessment activities at the Northeast and Southwest Groves pursuant to the <br /> FDEP's request. The work plan will outline the specific assessment activities to <br /> 43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.