My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/22/2013 (2)
CBCC
>
Meetings
>
2010's
>
2013
>
01/22/2013 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 10:46:16 AM
Creation date
3/23/2016 8:55:14 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
01/22/2013
Meeting Body
Board of County Commissioners
Book and Page
159
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000E\S0004MV.tif
SmeadsoftID
14201
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
!3:26 #6232 P.002 '003 <br /> SCHEDULE OF BID ITEAls <br /> All bid items shall include arts for furnishing to the OWNER all materials,equipment, and supplies and <br /> for all costs incurred in compledn;the work-including installation of all materials,equipment and supplies <br /> furnished, complete in place and ready for continued service. all other labor, taxes, insurance, <br /> miscellaneous cost,overhead and profit <br /> B1D <br /> West Regional W-W TP Anaerobic Tanks <br /> Odor Control System Design <br /> Ibis Contract is a LUMP SUM CONTRACT, which consists o< sum total of individual bid Items <br /> described below and BIDDER is to include all costs BIDDER may anticipate dating the length of this <br /> project and the contract. Each BIDDER shall include all extras the BIDDFR may determine necessary to <br /> provide the quantity and quality of Work required by the Contract Documents- Fill in the following bid <br /> breakdown which will he used to dctennine bid coavt -'teness and understanding, and then fill in the Total <br /> Lump Sum Bid Price on the line provided_The total bid price must be equal to the sum of the values in the <br /> bid breakdown- The verified suttl of the individual values in the bid breakdown takes precedence over any <br /> discrepancy between the Total Lump Sum Bid Price written and the corrected total lump sum bid price. <br /> The base bid schedule shall include the following items including the allowance listed below. Each <br /> individual bid item shah be paid based on completeness as defined in section 01025-Measurement and <br /> Payment <br /> Item Namber Item IMscJption Total <br /> I Mobilization $ C CCL' . <br /> 2 Anaerobic Tanke Flat Aluminum Cover $.. G QC'• — <br /> 3 Anocrobic Tanks Odor Control System $ JL4 %, Coo <br /> 4 Odor Control q Duct Work $ C <br /> 5 Crit%uiptnent BQM § ?-: — I ,t U <br /> F�xptostoa proof motors and accessone. few existing <br /> t $ d goo .0a <br /> Aluminum Canopy for exist Sludg,Area Odor ontroI <br /> 7 Equipmeat $ (o COO. 00 <br /> Two (_) Confined space entry onitoring Units Per <br /> 8 section 15050. $ o0o. O <br /> 9 tour. (4) 5 Cubic aid Moll-off Dumpsters and floor. <br /> 10 -Landscying••Buffer and irrigations Stcm $ )f p <br /> it New ARVs vent Piping and Pump quick connect $ <br /> rek=Uon and other mtscellaneoas items l�,000. O <br /> 12 Aluminum stop plales for Filter Per Drawing M-7 $ <br /> 13 Allowance $ Awn <br /> GRAND TOTAL BASE BID; $ ``C s I cj CL C '— <br /> �i c <br /> (In Words) <br /> (BIDDERS NAME) <br /> 00300-4 <br /> ADDENDUM NO. 1 <br /> A-8 <br /> 70 <br />
The URL can be used to link to this page
Your browser does not support the video tag.