My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/01/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
10/01/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 10:38:40 AM
Creation date
3/23/2016 9:02:27 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/01/2013
Meeting Body
Board of County Commissioners
Book and Page
271
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000G\S0004NN.tif
SmeadsoftID
14228
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 <br /> Utility Coordination Services <br /> Senior Utility Coordinator $115.00/per hour <br /> Utility Coordinator $85.00/per hour <br /> CAD Technician $75.00/per hour <br /> Vacuum Excavation for Monitoring Wells, Soil Samples,etc.(pricing based on <br /> Environmental Services excavation up to 10 feet) <br /> 1 -9 Monitoring Wells/Soil Samples $250.00/each <br /> 10- 19 Monitoring Wells/Soil Samples $200.00/each <br /> 20-49 Monitoring Wells/Soil Samples $150.00/each <br /> UTILITY CLEARING Using GPR/Conventional Electronic Line Locators $115.00/per hour <br /> Exploratory Excavation Projects Larger excavation projects which require specialized $285:00/per hour <br /> equipment(shoring,de-watering,etc.)will be quoted on a task <br /> by task basis. <br /> Concrete Radar Concrete assessment/inspection,grid scans,density . <br /> Mapping/Imaging and debris assessment <br /> 1 Man Crew $115.00/per hour <br /> Closed Circuit Televising <br /> Services $115.00/per hour <br /> Maintenance of Traffic (MOT) If required MOT specialists will be contracted and cost for <br /> same will be passed on with a 10%mark-up for coordination <br /> of same. <br /> hr SSMC MOT Lane Closures Per Lane Closure $350.00/day <br /> Per Lane Closure $500.00/night <br /> Survey Services for Utility Projects <br /> Project Manager/PSM $115.00/per hour <br /> 2 Man Crew $115.00/per hour <br /> 3 Man Crew $145.00/per hour <br /> Clerical $50.00/per hour <br /> GIS Mapping Services <br /> Personnel Classification <br /> Professional Engineer Project Management,Quality Control/Quality Assurance $115.00/per hour <br /> Project Reviews <br /> GIS Analyst Database Design,Programming,Quality Control/Quality $85.00/per hour <br /> Assurance <br /> GIS Technician Data Entry,Date Editing $75.00/per hour <br /> 1 Man GPS Crew Field Asset Inventory(sub-meter) $65.00/per hour <br /> 2 Man GPS Crew Field Asset Inventory(sub-meter) $115.00/per hour <br /> If HAZWOPER CERTIFIED personnel are required there will be a 20% increase in the Hourly Rate. <br /> i <br /> Gary B. Krick, PSM/President <br /> Date: <br />
The URL can be used to link to this page
Your browser does not support the video tag.