My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/01/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
10/01/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 10:38:40 AM
Creation date
3/23/2016 9:02:27 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/01/2013
Meeting Body
Board of County Commissioners
Book and Page
271
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000G\S0004NN.tif
SmeadsoftID
14228
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County Purchasing Division VAVERC, <br /> 1800 271h Street z <br /> Vero Beach, FL 32960 <br /> Phone (772) 226-1416 * _ <br /> Fax (772) 770-5140 �LORW ' <br /> Bid Form <br /> Annual Bid for Asphalt Paving and Resurfacing <br /> Bid #: 2014004 <br /> Bid Opening Date and Time: August 30, 2013 2:00 P.M. <br /> Bid Opening Location: Purchasing Division <br /> 180027 th Street <br /> Vero Beach, FL 32960 <br /> Bidder Name: <br /> In accordance with all terms, conditions,specifications,and requirements, the Bidder offers the following: <br /> Item Description Estimated <br /> Quantity Unit Price Total Cost <br /> SP 9.5 Traffic Level C including hauling and <br /> 1 spreading by an approved spreader. For projects 7,000 tons $ 0/ /ton $ <br /> requiring 300 tons or more per mobilization <br /> SP 9.5 Traffic Level C including hauling and <br /> 2 spreading by an approved spreader. For projects 2,000 tons $ /ton $ / CCG <br /> requiring 100-299 tons per mobilization <br /> SP 9.5 Traffic Level C including hauling and <br /> 3 spreading by an approved spreader. For projects 40 tons $ 7i /ton $ — <br /> requiring 20-99 tons per mobilization <br /> 4 Increase or Decrease to use SP 12.5 Traffic Level C in _ <br /> lieu of SP 9.5 Traffic Level C 1,000 tons $ -3 /ton $ _3 �— <br /> 5 Increase or decrease for subdivision work 2,000 tons $ /ton $ - <br /> 6 Additional flagmen (over and above two flagmen <br /> included in asphalt price) 550 hours $ 27 /hr $ - <br /> 7 Tack coat as per DOT specs 8,000 gal $ 3 VC, /gal $ <br /> 8 Prime as per DOT specs 3,000 gal $ _3 9`_ /gal $ <br /> 9 Tie-ins 1,000 sq yd $5-to /sq yd. $ — <br /> Total for items 1-9 <br /> 10 SP 9.5 for pickup by Indian River County 500 tons $ 76 — /ton $ <br /> Page 12 of 16 <br /> 86 <br />
The URL can be used to link to this page
Your browser does not support the video tag.