My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/01/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
10/01/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 10:38:40 AM
Creation date
3/23/2016 9:02:27 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/01/2013
Meeting Body
Board of County Commissioners
Book and Page
271
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000G\S0004NN.tif
SmeadsoftID
14228
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County Purchasing Division " VER C, <br /> 180027 th Street 4 <br /> Vero Beach, FL 32960 <br /> Phone (772) 226-1416 <br /> Fax (772) 770-5140 <br /> Bid Form <br /> Annual Bid for Asphalt Paving and Resurfacing <br /> Bid #: 2014004 <br /> Bid Opening Date and Time: August 30, 2013 2:00 P.M. <br /> Bid Opening Location: Purchasing Division <br /> 180027 th Street _ 7 <br /> Vero Beach, FL 32960Li <br /> Bidder Name: RANGER CONSTRUCTION INDUSTRIES, INC. <br /> In accordance with all terms,conditions,specifications,and requirements,the Bidder offers the following: <br /> 'tern Description Estimated <br /> P Unit Price Total Cost <br /> Quantity <br /> SP 9.5 Traffic Level C including hauling and <br /> G <br /> 1 spreading by an approved spreader. For projects 7,000 tons $ ton $ <br /> requiring 300 tons or more per mobilization <br /> SP 9.5 Traffic Level C including hauling and <br /> 2 spreading by an approved spreader. For projects 2,000 tons $ %/ton $ <br /> requiring 100-299 tons per mobilization <br /> SP 9.5 Traffic Level C including hauling and <br /> 3 spreading by an approved spreader. For projects 40 tons $ r i /ton $ <br /> requiring 20-99 tons per mobilization l 74/02 <br /> Increase or Decrease to use SP 12.5 Traffic Level C in <br /> 4 lieu of SP 9.5 Traffic Level C 1,000 tons $ _ y� /ton $ / <br /> 5 Increase or decrease for subdivision work 2,000 tons $ S 2Y- /ton $ ll 2 <br /> ov <br /> 6 Additional flagmen (over and above two flagmen - <br /> included in asphalt price) 550 hours $�,2 /hr $ «J 1j�— <br /> 7 Tack coat as per DOT specs 8,000 gal $ L /gal $ <br /> 8 Prime as per DOT specs 3,000 gal $ /gal $ L 0 <br /> 9 Tie-ins 11000 sq yd $ ,?yam/sq yd. $ d <br /> Total for items 1-9 $ /0/ 7 41L/7 0�=' <br /> J SP 9.5 for pickup by Indian River County 500 tons $ /ton $ 0 �° <br /> Page 12 of 16 <br /> 88 <br />
The URL can be used to link to this page
Your browser does not support the video tag.