Laserfiche WebLink
However, in the event the total Project cost is less than the estimated Project cost stated above, the <br /> Department shall oily pay 75%of the lesser amount and all remaining costs of the Project will be paid by <br /> the County. <br /> 4. Exhibit B,Deliverables,of the Agreement is amended as follows: <br /> DELIVERABLES <br /> CR-512(ROSELAND ROAD TO EASY STREET) (EASTBOUND LANES ONLY) <br /> INDIAN RIVER COUNTY, FLORIDA <br /> ITEM ESTIMATED UNIT <br /> QTYS. <br /> MOBILIZATION(INCLUDES PUCBLIC CONSTRUCTION BOND) LS 1 <br /> MAINTENANCE OF TRAFFIC LS 1 <br /> EROSION AND WATER POLLUTION CONTROL LS 1 <br /> RECLAIMED ASPHALT BASE COURSE FULL DEPTH RECLAMATION SY 32,765 <br /> ASPHALT EMULSION TYPE CSS-1h GAL 87,126 <br /> SUPERPAVE ASPHALTIC CONCRETE I"SP-9.5 _ SY 31,682 <br /> SUPERPAVE ASPHALTIC CONCRETE 1-112"SP-12.5 SY 31,682 <br /> PERFORMANCE TURF-SODDING BAHIA SY 8,855 <br /> PERFORMANCE TURF-SODDING(ST.AUGUSTINE,FLORITAM OR MATCH EXISTING) SY 5,904 <br /> ECONOLITE VEHICLE DETECTOR ASSEMBLY AS 3 <br /> SINGLE POST SIGN <12 4-2R MERGE AS 1 <br /> SINGLE POST SIGN <12 R3-7R RIGHT LANE MUST TURN RIGHT AS 2 <br /> RPM BI-DIRECTIONAL(WHITE/RED) EA 280 <br /> RPM(BI-DIRECTIONAL(AMBER/AMBER) EA 54 <br /> RPM BI-DIRECTIONAL(WHITE/MONO) EA 7 <br /> THERMOPLASTIC,TRAFFIC STRIPE WHITE SOLID 6" _ LF 9,830 <br /> THERMOPLASTIC TRAFFIC STRIPE WHITE,SOLID 12" LF 345 <br /> THERMOPLASTIC,TRAFFIC STRIPE,WHITE,SOLID 24" _ LF 135 <br /> THERMOPLASTIC TRAFFIC STRIPE WHITE SKIP 6" 6'-10' LF 1,434 <br /> THERMOPLASTIC,TRAFFIC STRIPE,WHITE,SKIP,6" 10'-30 LF 7,991 <br /> THERMOPLASTIC,PAVEMENT MESSAGE MERGE EA 2 <br /> THERMOPLASTIC,PAVEMENT MESSAGE ONLY EA 2 <br /> THERMOPLASTIC,STANDARD,WHITE,TURN ARROW EA 16 <br /> THERMOPLASTIC,STANDARD,WHITE,MERGE ARROW EA 2 <br /> THERMOPLASTIC,TRAFFIC STRIPE,YELLOW,SDLID,6" LF 8,628 <br /> The Participant will need written approval from the Department, if deviating from the items shown in <br /> Exhibit B. <br /> 2 of 3 <br /> 60 <br />